Shreesh A Khadilkar, Consultant and Advisor, and Former Director Quality and Product Development, ACC Ltd Thane, discusses the importance of optimising the use of alternative fuel and raw materials (TSR percentage) in cement production without affecting clinker quality.

We all know that in the calciner the CaCO3 undergoes calcination producing CaO, part of this CaO reacts with Al2O3, Fe2O3 SiO2 to form aluminates, ferrites, Belite and some CaO remain as uncombined CaO in the material that enters the kiln, this uncombined CaO further reacts, as the material passes through the kiln to form clinker of desired phase composition with at desired levels of free lime. If this uncombined CaO is less, the resultant clinker would have lower free CaO.
Due to fluctuations of moisture in the SAFR feed, the calciner outlet temperature tends to decrease/fluctuate although the calcination is complete, some of the above post calcination reactions of the CaO are decreased, as a result the uncombined CaO is higher, in the material entering the kiln. The reactions in the kiln are affected for the same throughput and either the clinker free lime is high or the clinker shows lesser C3S percentage (depending on the burnability of the kiln feed).
In plants equipped with XRD it would be possible to monitor the uncombined CaO in Hot meal and optimise the Calciner outlet temperatures so as to achieve the desired uncombined percentage of lime as explained above. If the value is much lower than the desired level it would indicate subsequent lower LSF in the clinker, so addition of lime sludge or limestone powder as explained above would maintain the desired clinker specs. These actions, if affected during the day, would help maintain the day’s average clinker quality.
Besides the variability of the moisture percentage, the ash percentage and its composition in SAFR could change the composition of calcining material and finally depending on these changes, the post calcination reactions would be affected, depending on the uncombined percentage of lime value (monitored by XRD of hot meal), the corrections as explained above would help correct the composition and maintain the burning zone performance and the resultant clinker quality. Thus, if the calciner outlet temperature / kiln inlet material / C6 material temp. (as the case may be) is maintained higher and necessary corrections are made through SAFR or through the kiln feed. We can maintain the uncombined CaO at desired level where we could get good kiln performance as well as a good/improved clinker quality even at a higher percentage of AFR/TSR.
In many plants there is a tendency to increase the clinker Fe2O3 as and when there is an excessive dust generation and dusty kiln performance, this attempt to increase Clinker Fe2O3 would not actually help in improving the kiln conditions and maintaining clinker quality. In another plant equipped with XRD, the limestone had higher Fe2O3 content and to compensate for the effect of the varying moisture of SAFR the Calciner outlet temperature was maintained at around 920oC so that the desired post calcination reactions could be achieved and the uncombined CaO (monitored by XRD of hot meal) was maintained at desired levels.
The clinker LSF also could be maintained but the Free CaO tended to be high. The hot meal XRD indicated that the belite formations were lower in hot meal as and when the clinker free lime was high. Although the Silica was contributed from the Solid AFR as this silica was sand/silt, which did not react, the clinker IR also was observed to increase by around 0.4 per cent use of pondash (having reactive silica) along with the solid AFR up to 1 per cent was observed to increase the Belite content of hot meal and the resultant clinker had desired phase formations with lower free lime. For calculation of PSF/Potential phase composition a correction was given to the clinker silica contents (by subtracting the change in IR of clinker).
Thus, it needs to be noted here that in RDF/MSW, SAFR the ash content may have coarse sand grains, which cannot at the calcination stage and it the burnability is sensitive to silica contents, such corrections of use of wet fly ash with the SAFR could be advantageous to maintain clinker quality. However, these corrections have to be affected during the day through XRD monitoring of Hot meal and subsequent Clinker (say after 40 minutes) so that at the end of the day the clinker is of desired quality specs.
Thus, in plants coprocessing higher levels of AFR it is recommended to have a ‘bi-hourly dashboard’ and the day average clinker consistency in Quality Monitored by ‘compliance percentage to clinker specs’ as shown in Tables 1 and 2.
Such a dashboard helps having the entire plant operations involved in taking bi hourly actions so as to maintain the quality and process targets with increase in SAFR/LQAFR thus, achieving a higher compliance percentage to clinker quality specs. This has enabled not only to maintain clinker quality but it also showed improvements in clinker quality.

Actions: In plant with high TSR percentage without XRD
The hot meal samples at different kiln inlet material temperatures were collected at 870,900n and 930oC along with corresponding clinker samples (after say 40 minutes) and the XRD analysis was carried out at external labs. Through the bi-hourly dashboard actions the clinker compositions were maintained as per desired target. The XRD Mineralogy of Hot Meal and clinker XRD are tabulated in Table 3.
Although the plant maintains 95 per cent DOC, the XRD however indicates >99.5 per cent calcination. Thus, even in the absence of XRD using the bi-hourly dashboard optimisation of clinker quality can be made possible, however having an XRD (even a low watts XRD) would always be advantageous, especially if the kiln feed shows moderate burnability.

Other important considerations

  • As discussed above bi-hourly corrections made to clinker composition could be through the SAFR/RDF mix, in one plant it could be use of waste lime sludge/ in another plant use of wet pond ash/ in another use of limestone crusher dust/ high grade limestone powder depending on the corrections desired.
  • In case such materials are not available in the plant for corrections, the necessary actions bi-hourly, to adjust the clinker LSF, could be by changes in proportion of high ash coal + coal Petcoke mix in calciner or it could be even be targeting an appropriate kiln deed composition to accommodate the ash percentage of SAFR/RDF or bihourly changing the feed rate (TPH) of SAFR, as per the bi-hourly clinker composition requirements.
  • Reducing conditions can have substantial effects on clinker quality like problems with sulfur integration, Alite decomposition (strength reduction), conversion from C4AF to C3A (acceleration of setting), change in color of cement (from greenish grey to brownish), the detection of reducing conditions could be done using ‘Magotteaux Test’, it is important to assess the reducing conditions whether internal or peripheral, would indicate possible reasons.
  • Internal reducing conditions indicate that due to changes in liquid viscosity the larger clinker nodules are black from outside but yellow to brownish in the internal core. Such clinker nodules roll down from the transition zone with an unburnt core which disintegrates on cooling due to gamma C2S. Such nodules have high free lime, delocalised or peripheral reducing conditions due to larger size of solid AFR component (shredded size) showing CO peaks.
  • The Hot meal (2Cl+SO3) needs to be reliably monitored using XRF standards of Hot Meal. Every plant would have a threshold value of (2Cl+SO3), value >3.5 is reported to cause severe depositions at kiln inlet/riser duct/cyclones.
  • The kiln system should be able to handle the higher gas volumes (calciner , inlet and preheater).
    Increased percentage of AFR /TSR is associated with increase in limestone pile LSF which is linked to life of mines (Fig:2). This increase in limestone pile LSF would be more plant specific.
  • To lessen the impact on limestone Pile LSF/Mines life the plant would have to use, sweetener limestone (availability/cost), reduce the percentage use of high silica correctives with purer correctives, use petcoke or low ash coal (imported), use of waste lime sludges available from chemical industries.
  • As discussed earlier the plant could use a mix fuel (petcoke + high ash coal), or (mix of petcoke + high ash wastes like Dolochar/spent carbon etc.) in the calciner, the mix ratio could be changed so as to improve clinker LSF during the day (as a bi-hourly actions).
    High ash (high iron/high silica) wastes should not be fired through the kiln fuel; these wastes should be put through calciner fuel if feasible or along with solid wastes. It is always beneficial to have low ash coal (fuel) / petcoke in kilns.
  • It is recommended to use 4 per cent to 5 per cent high LSF Limestone in petcoke grinding (especially for kiln fuel). It improves the efficiency of petcoke grinding and would help to bind the sulphur during combustion in kiln, thus decreasing the SO3 of the hot meal. Using limestone decreases the SO3 fluctuations in the clinker and the excess of CaCO3 forms C3S clusters in the clinker, thus, improving clinker grindability.
  • Petcoke grinding is usually controlled at 1 per cent to 2 per cent on 90 microns. However in certain grinding systems, the 45 microns residue is observed to be as high as 26 per cent to 28 per cent which could create reducing conditions and initiate some coating formation in pre pre-transition zone in kilns.
  • Large storage yards to stock different types of solid AFR would help to mix the waste in certain proportions so as to achieve relative consistency in ash percentage or even chloride contents.
  • An auto-sampler with shredder on the solid AFR conveyor would be useful. However, the analysis time would be around 4 to 5 hours which is too high.
  • If the plant is reaching >25 per cent TSR, from a futuristics angle, having an online Cross Belt analyser like ‘Spectra Flow’ could help analyse moisture percentage, ash percentage and its constituents in real time, enabling rapid corrections to clinker compositions with necessary modifications to the kiln system even much higher TSR levels could be achievable.
  • Higher TSR levels invariably are associated with increase in Hot meal alkalis, chlorides and sulphates and would necessitate chloride bypass.
  • The procurement has a high responsibility of providing appropriate SAFR/RDF fuel of different ash percentage and of different chloride percentage (screened to remove sand/mud/stones).
  • Wastes having CaO rich ash would always be advantageous for the same TPH of solid AFR, the TSR percentage would be higher if the NCY of the sold AFR is higher.

Conclusion
The paper indicates and discusses in some details the avenues for increased TSR percentage without affecting clinker quality. However, depending on calciner retention time and air volume availability there would be a certain maximum TSR percentage that can be achieved. It may be noted here that the kiln system would necessitate suitable upgradation for achieving a much higher TSR percentage. It is needless to mention that XRF Models with standardless software for elemental analysis of solid/liquid AFR would be advantageous and as discussed having an XRD would be a necessity to maintain clinker quality at higher TSR percentage.
Clinkers with High MgO (>4.5 per cent) would be a challenge and optimising the CaO/SiO2 ratio would be a key to improve clinker quality use of XRD in such clinkers would be an asset.
Futuristically, ‘Torrefaction Process’ (the process of degrading organic materials in a nitrogen or inert environment within a temperature range of 200oC to 300oC) of bio wastes if extended suitably to MSW wastes and other solid AFR to produce a bio coal, could become an excellent opportunity for increased TSR for cement plants.
In this paper I have tried to share some observations in a generalised manner made at different plants with different AFR/TSR percentage which could be useful for other plants for their future road map on maximising TSR percentage.

About the author:
Shreesh Khadilkar, Consultant and Advisor brings over 37 years of experience in cement manufacturing, having held leadership roles in R&D and product development at ACC Ltd. With deep expertise in innovative cement concepts, he is dedicated to sharing his knowledge and improving the performance of cement plants globally.

Concrete

India’s Cement Sector Cuts Energy Use, but Worker Safety Worsens

iFOREST finds efficiency gains alongside water and safety concerns

Published

on

By

Shares

India’s cement sector has improved its energy and carbon efficiency, but rising groundwater use in water-stressed regions and deteriorating worker safety remain significant concerns, according to a report by the International Forum for Environment, Sustainability & Technology (iFOREST). The findings also highlighted weak policy implementation and gaps in sustainability reporting.

India, the world’s second-largest cement producer, uses about 2.54 gigajoules of energy per tonne (GJ/t), below the global average of 2.88 GJ/t. However, renewable sources accounted for only 5.1 per cent of the sector’s energy mix, indicating continued dependence on conventional sources.

The report assessed 18 cement companies against 107 Business Responsibility and Sustainability Reporting indicators for FY24 and FY25. The companies covered 87 per cent of India’s cement production. Carbon emissions intensity declined from 0.58 to 0.57 tonnes of carbon dioxide per tonne, but total emissions increased 4 per cent to 224.3 mn t, equivalent to about 6 to 7 per cent of India’s overall emissions.

Overall water withdrawal declined 9.5 per cent during the study period, while withdrawals in water-stressed areas, mainly in Rajasthan, increased by more than 20 per cent. Groundwater’s share of withdrawals in these areas rose from 27 per cent to 38 per cent, raising concerns about the sector’s impact on vulnerable water resources.

The sector employs about 228,000 people, including 63 per cent contractual workers, 3.1 per cent women and 0.07 per cent persons with disabilities. Women in key managerial roles earned 26.8 per cent less than men, while median pay for women workers fell 11.1 per cent in FY25 as men’s pay increased. Worker injuries rose 36.5 per cent to 359, and fatalities increased from 17 to 22, with workers accounting for more than 90 per cent of deaths.

iFOREST recommended cement-specific reporting guidance, standardised metrics, mandatory production disclosure and third-party verification. It also called for environmental, social and governance policies to be integrated into business strategies and implemented more effectively on the ground.

Continue Reading

Concrete

Ambuja Cements Expects Volume Growth to Outpace Industry in H2

Ambuja Cements sees stronger trade and institutional demand in H2 FY27.

Published

on

By

Shares

Ambuja Cements expects its sales volumes to grow faster than the cement industry during the second half of fiscal year 2027, as it seeks a recovery in institutional demand after a weak first half. The Gautam Adani-owned company is aiming to rebuild volumes while protecting profitability.

The company reported a 90 per cent year-on-year decline in consolidated net profit attributable to owners of the parent to Rs. 1.93 bn for the quarter ended 30 September, from Rs. 17.74 bn a year earlier. The previous year’s profit included a reversal of income-tax provisions worth Rs. 16.97 bn. Revenue from operations rose marginally to Rs. 91.66 bn from Rs. 91.3 bn.

Trade volumes increased 8.6 per cent year-on-year in the September quarter, but weaker institutional sales left overall volumes broadly unchanged. Ambuja Cements expects both trade and institutional sales to turn positive in the third and fourth quarters. Trade sales are made through dealers and distributors, while institutional or business-to-business sales involve bulk supplies to infrastructure developers, government projects and real estate companies.

The company had earlier reduced institutional sales that did not generate adequate returns. It now plans to rebuild the business selectively, while continuing to prioritise trade sales and higher-value products. Trade accounted for 74 per cent of sales in the quarter, up six percentage points from a year earlier, while premium products increased to 37 per cent of trade sales from 35 per cent. Blended cement’s share rose to 82 per cent from 77 per cent.

Ambuja Cements commissioned 4.6 mn t of capacity during the quarter. Another 3.2 mn t at Bathinda in Punjab and Jodhpur has stabilised, with the facilities expected to ramp up in the second half. A further 2.4 mn t facility at Varkala in Bihar is scheduled for commissioning during the period. Higher fuel and logistics costs remain a challenge, while the company has realised a cement price increase of about Rs. 10 per bag in October and is targeting operating costs of Rs. 4,250 per t for the full year.

Continue Reading

Concrete

JK Lakshmi Cement Begins Rs 110 Billion Assam Plant Project

The 2.5 MTPA integrated cement plant is expected to be completed by FY2029.

Published

on

By

Shares
JK Lakshmi Cement has recently laid the foundation stone for Project Kamakshi, its first integrated cement manufacturing facility in Assam, marking its entry into Northeast India. The groundbreaking ceremony was held at Umrangso village in Dima Hasao district in the presence of Assam Chief Minister Himanta Biswa Sarma.
The project involves an investment of Rs 110 billion, including the mining lease, and will have an annual cement production capacity of 2.5 million tonnes, supported by a 1 million tonne clinkerisation unit. Scheduled for completion by FY2029, the facility is expected to generate employment for over 2,000 people while catering primarily to the growing Northeast market.
The integrated plant will feature dedicated railway sidings to facilitate efficient transportation of raw materials and finished cement, strengthening supply chain reliability and regional distribution.
Vinita Singhania, Chairperson and Managing Director, JK Lakshmi Cement, said, “”Project Kamakshi is the start of a long-term relationship with Assam and the wider North East. This is a region that is building fast, and it deserves quality cement made close to home. With this plant, we want to bring scale, jobs, and dependable supply to the region. At JK Lakshmi Cement, we believe that building a stronger India goes beyond infrastructure. It is also about growing together with the communities we serve.””
The investment aligns with the company’s strategy to expand into high-growth markets beyond its established presence in Northern, Western and Eastern India. The project is also expected to support regional economic development and infrastructure growth.
JK Lakshmi Cement aims to pursue its expansion plans while working towards its long-term target of achieving net-zero emissions by 2047.

Continue Reading

Video Thumbnail
▶

    SIGN-UP FOR OUR GENERAL NEWSLETTER

    Trending News

    SUBSCRIBE TO THE NEWSLETTER

     

    Don't miss out on valuable insights and opportunities to connect with like minded professionals.

     


      This will close in 0 seconds