Vijay Shah, Managing Partner, India Precast, advocates the use of precast concrete as he puts forth details about its manufacturing, uses and methods while emphasising the sustainability of the product.
Explain the process of casting concrete in shapes and what is the grade of concrete used for making these shapes? Precast casting concrete elements are manufactured with the required steel reinforcement either in formwork, moulds or on steel plates with side shuttering etc. The concrete cast is made at a different location and is then transported to the site. Precast elements are made of minimum M20 to M50 grade of concrete.
What is the difference between precast and cast in-situ as uses of concrete?
The use of concrete in the precast method and the cast in-situ method differs widely based on many factors.
Precast concrete shapes are cast at a different location and are then transported to the site where construction work takes place while with the cast in-situ process, concrete is poured on-site.
Curing of precast concrete is fast as it takes place under ideal and controlled conditions while the cast in-situ concrete takes relatively longer to get cured but can be easily used for two-way structural systems.
For the precast concrete, the process is easy to do and is repeatable as the same moulds or framework can be used. This increases the value of construction and derives more value
while cast in-situ adapts building shapes and post tensioning.
The work and rework in the usage of precast shapes is less, thus, reduces cost at the site
while with the cast in-situ method there is a requirement of space allotment for concrete mix and necessary add-ins, that is added cost for the construction job.
Tell us about prestressed and reinforced concrete. Prestressed concrete is a combination of high strength concrete and tensioned steel strands. This combination makes a strong structural unit that is useful in building roof slabs, bridge girders etc. Reinforced concrete is manufactured from a combination of high strength concrete and normal reinforcement bars.
Tell us more about the precast elements manufactured, their shapes and sizes. Precast is one of the best ways to rapidly build industrial buildings, commercial buildings, affordable housing, mass, EWS, LIG housing, schools, hospitals, public buildings, agriculture railways, stadiums, sport centres, parking, bridges, airports etc. They have a higher productivity and quality set at industry level. Various types of precast elements manufactures are:
Floor and roof slabs are made from prestressed load bearing hollow core concrete slab and ribbed slabs. They are also made from half floor slab or semi-finished floor slab with a lattice girder
Precast stair cases, balcony, toilet pods, lift shafts, water tanks
Prestressed lintel, frames, beams, columns and double-tee beams
Internal partition walls are made with light-weight hollow core wall panels instead of AAC blocks or bricks
Boundary walls, fencing poles, U-drainage or trenches, box culvert etc.
What is hollowcore concrete flooring and what is its lifespan? Hollowcore slabs are precast, prestressed concrete elements that are generally used for flooring. Some of the advantages of using these flooring are longer lifespans and no propping, flexibility in designs, faster construction, lightweight structures, fire resistant structures, high load capacities and units manufactured specific to the project. The maximum span of hollowcore floors will depend on the floor depth and the specific loadings imposed on the floor.
What are the quality standards followed while making precast shapes for any project? Quality control is a very important aspect in the process of making precast concrete shapes. It is imperative to make precast shapes as per the exact requirement provided by the engineers and the construction party. To maintain the quality of product from our end,
We ensure there are quality control systems and procedures in place along with a quality assurance plan. Our programme consists of tests, trials, and general procedures for acceptance.
There is a laboratory and related facilities, which are required for the selection and control of the quality of materials and workmanship. The central quality laboratory is used for various quality control tests like cube test, workability test, slump test, sieve analysis etc. The materials used for making the final precast shapes also has to be shared for testing to various third-party laboratories with an advance intimation.
All the necessary tests are carried out in respective batching plants or sites depending on the use of concrete at our facility.
Documentation for all the tests conducted and their reports is maintained in records, for references and submission to the relevant authorities and the users of the same.
As precast use of concrete is conducted in a dedicated space and is in a monitored environment, it becomes easier to maintain high quality due to its repeatability factor. The necessary general precast machinery and moulds, steel tables, concrete batching and dispensing equipment, vibrating and finishing equipment and dedicated labour team help maintain the higher quality standards as compared to cast in-situ use of concrete.
How do you incorporate sustainability in the process of precasting? Precast use of concrete promotes sustainability with its repeatability factor. There’s more planning involved in the process and equipment like the moulds, vibrating machine, finishing machine are all reusable elements of the process. As mentioned, there is planning in precast use of concrete where only the required measure of concrete is mixed and poured into moulds that are made to precision as per the requirement of the project. The quantity is also previously defined, which means there is reduced to zero wastage of material. This waste reduction leads to lesser needs of cleaning and clearing equipment, which may further be fueled by other energy sources. Thus, precast concrete, by large, is a sustainable means of building.
What are the advantages of using precast concrete? There are multiple advantages of using a precast structure for any project like cost efficiency, speed, versatility, safety, sustainability and beauty. This includes:
The use of precast improves the quality and lifespan of any building
It reduces the time of building, thus reducing the costs involved for all the other equipment and labour that goes in to the project, thus, proving to be cost effective
The maintenance of a precast is lower due to its high quality and durability that is ensured while it is cast
This method of using concrete is a sustainable option due to its repeatability
What are the major challenges you face in the process of making precast shapes and in their transportation? The precast industry plays on volume and repetition. This is one of the major challenges as well. The requirement of having to repeat the process that contains a large volume of mixed concrete and getting the same perfection in the shapes is a cumbersome process. The initial investment in setting up the precast plant and acquiring all equipment and moulds is high. With bulk shapes to be transported from one place to another and the requirement for site space and handling, this time of concrete use is more suitable for tier 2 and tier 3 cities.
How do precast elements or shapes help in the profitability of a construction activity? As precast concrete is made at a different location than the construction site, the other jobs keep going on at the site and then the precast shapes are placed there. This reduces construction time to up to one-third to one-fifth as compared to cast in-situ concrete, thus, reducing cost of the construction. Construction maintenance is reduced as the quality of their precast structures are monitored and carefully administered at the plant level. This means it adds to the reliability, durability, accuracy, and ability to produce architectural elements in any building adding to its quality and strength. Precast also provides insulation, thermal inertia and fire resistance and the possibility of integration with MEP (Mechanical, Electrical and Plumbing) from the start of the project.
How can precast concrete contribute towards affordable mass housing in India? Defined shapes and technical requirements in precast concrete helps reduce the waste and increase the repeatability factor, thus, reduces the cost and time for any construction or building project. Higher control on quality, less time consumer leads to lesser need of labour and equipment on-site, which also adds to the profitability of the structure. All factors combined bring down the overall cost of the project, leading to that benefit translating to the end consumer and bringing a surge of affordable mass housing in India.
-Kanika Mathur
Comparison Between Cast-in-situ (conventional method) versus Technology Drive Precast
Sr. No Criteria Conventional Construction Precast Construction 3D Modular/ Panel & Hollow Core Slab. 1 Natural resource consumption High 30 per cent saving 2 Labour Problem Heavy labour problem while work in progress Less labour required 3 Dependability on skilled labor 60 per cent Dependability 4 Time consuming Verv High Fast track 5 Initial investment Low High 6 Finishin Normal Excellent 7 Quality production Poor Excellent as factory based. 8 Material wastage High Least 9 Speed/ Productivity Low Excellent 10 Strength Good Excellent 11 Durability Low High 12 Structure weight/ Deed load Very heavy Reduced 13 Brick Block and Plastering Required No Need 14 Service like Electrical, plumbing & sanitary Break, Provide & Re-build Pre-embedded
JK Cement gained after being declared preferred bidder for the Gilund Limestone Block in Chittorgarh, Rajasthan, a lease area of 370.96 hectares. The firm saw its shares trade at Rs. 5550.05, up by 28.45 points or 0.52 per cent from the previous close of Rs. 5521.60 on the BSE. The scrip opened at Rs. 5569.15 and touched a high of Rs. 5625.00 and a low of Rs. 5531.00.
The stock recorded turnover of 1742 shares on the counter and the BSE group A stock with face value Rs. 10 has a 52 week high of Rs. 7565.00 on 20-Aug-2025 and a 52 week low of Rs. 4670.05 on 12-Jun-2026. Last one week high and low stood at Rs. 5625.00 and Rs. 5329.00 respectively. The promoters holding in the company stood at 45.66 per cent, while institutions and non-institutions held 40.61 per cent and 13.73 per cent respectively.
The e-auction conducted by the Government of Rajasthan resulted in the company being declared preferred bidder for the mining lease, and the allocation will enable the company to plan phased development of the deposit, subject to regulatory approvals. The Gilund block spans 370.96 hectares and its allocation is intended to support raw material security for the company’s cement operations in the region. The designation follows the government auction process and will allow the company to plan development and integration of the deposit into its supply chain.
The current market capitalisation stands at Rs. 430.38 billion (bn), reflecting market response to the mining news and prevailing valuation levels for the sector. Investors and analysts will watch for formal allotment and related disclosures that can clarify timelines, capital expenditure and expected production profiles. The report is intended for informational purposes and does not constitute investment advice, and market participants are advised to consult advisers before making decisions.
Star Cement has been declared the preferred bidder for the mining lease for Boro Lakhindong West Block following e-auctions conducted by the Government of Assam. The block is located in Boro Lakhindong Village, Umrangso Tehsil, Dima Hasao District, Assam, and extends over an area of 123 hectares. The estimated limestone resource is 207.822 million (mn) tonnes (t), a quantity that will supply raw material for cement production and support the company’s manufacturing operations in the region.
The company is engaged in the manufacturing and selling of cement clinker and cement and distributes products across the north-eastern and eastern states of India. Star Cement operates plants and logistics networks that procure and process limestone to produce clinker for cement, and the addition of Boro Lakhindong is presented as a strategic enhancement of feedstock availability. The preferred bidder status secures rights to the specified lease area under the terms of the auction process.
Financial results for the company in the fourth quarter of fiscal year 2026 showed a consolidated net profit rise of 20.24 per cent to Rs 1,481.0 mn on an 11.54 per cent increase in revenue to Rs 11,735.5 mn compared with the corresponding quarter of the previous year. Those results reflected higher sales volumes and revenue growth in the company’s primary markets and are cited in company disclosures accompanying the lease announcement. The reported performance provides context to the company’s ability to pursue and finance new mining lease opportunities.
Market reaction to the declaration was modest, with the scrip rising zero point thirty six per cent to trade at Rs 212 on the BSE. The award of the Boro Lakhindong lease concludes the e-auction process for the west block and assigns operational rights to Star Cement as the preferred bidder, subject to completion of statutory and contractual formalities.
The Karnataka Electricity Regulatory Commission (KERC) has proposed a reduction in the tariff paid for surplus electricity that rooftop solar installations export to the grid, prompting concern among consumers, renewable energy advocates and industry specialists. The proposal arrives while the Central government and state governments are promoting clean energy adoption and offering subsidy schemes to encourage rooftop solar deployment. Thousands of households in Karnataka, particularly in Bengaluru, have invested substantial sums in rooftop systems to reduce reliance on conventional power and support state renewable targets.
Stakeholders have raised questions about the implications of a lower export tariff for the financial attractiveness of rooftop solar investments and the pace of the state transition to renewables. Industry analysts warned that a reduction in compensation for excess generation could discourage new installations and extend payback periods for existing systems. Current messaging from authorities, which simultaneously promotes adoption while proposing lower export rates, has been described by user groups as creating contradictory signals for consumers.
Experts argued that policy measures should focus on grid modernisation rather than reducing consumer benefits, with investments in transmission and distribution networks needed to manage higher volumes of distributed solar generation. Consumer groups and renewable advocates are preparing written submissions to the regulator and are urging retention of incentives that support household adoption of rooftop systems. KERC has invited public objections and suggestions as part of a consultation process that will determine the final tariff framework.
The outcome of the consultation is expected to influence the future growth of rooftop solar across the state and shape investor confidence in small-scale renewable projects. Residents who have already installed rooftop panels are monitoring developments closely because changes to compensation mechanisms may affect household finances and the speed of return on investment. Observers noted that coherent policy, aligned incentives and grid upgrades would be essential to sustain momentum in the rooftop solar sector.