Vijay Shah, Managing Partner, India Precast, advocates the use of precast concrete as he puts forth details about its manufacturing, uses and methods while emphasising the sustainability of the product.

Explain the process of casting concrete in shapes and what is the grade of concrete used for making these shapes?
Precast casting concrete elements are manufactured with the required steel reinforcement either in formwork, moulds or on steel plates with side shuttering etc. The concrete cast is made at a different location and is then transported to the site. Precast elements are made of minimum M20 to M50 grade of concrete.

What is the difference between precast and cast in-situ as uses of concrete?

  • The use of concrete in the precast method and the cast in-situ method differs widely based on many factors.
  • Precast concrete shapes are cast at a different location and are then transported to the site where construction work takes place while with the cast in-situ process, concrete is poured on-site.
  • Curing of precast concrete is fast as it takes place under ideal and controlled conditions while the cast in-situ concrete takes relatively longer to get cured but can be easily used for two-way structural systems.
  • For the precast concrete, the process is easy to do and is repeatable as the same moulds or framework can be used. This increases the value of construction and derives more value
  • while cast in-situ adapts building shapes and post tensioning.
  • The work and rework in the usage of precast shapes is less, thus, reduces cost at the site
  • while with the cast in-situ method there is a requirement of space allotment for concrete mix and necessary add-ins, that is added cost for the construction job.

Tell us about prestressed and reinforced concrete.
Prestressed concrete is a combination of high strength concrete and tensioned steel strands. This combination makes a strong structural unit that is useful in building roof slabs, bridge girders etc. Reinforced concrete is manufactured from a combination of high strength concrete and normal reinforcement bars.

Tell us more about the precast elements manufactured, their shapes and sizes.
Precast is one of the best ways to rapidly build industrial buildings, commercial buildings, affordable housing, mass, EWS, LIG housing, schools, hospitals, public buildings, agriculture railways, stadiums, sport centres, parking, bridges, airports etc. They have a higher productivity and quality set at industry level.
Various types of precast elements manufactures are:

  • Solid load bearing floor slabs, load bearing walls, facades, sandwich wall panels and cladding panels
  • Floor and roof slabs are made from prestressed load bearing hollow core concrete slab and ribbed slabs. They are also made from half floor slab or semi-finished floor slab with a lattice girder
  • Precast stair cases, balcony, toilet pods, lift shafts, water tanks
  • Prestressed lintel, frames, beams, columns and double-tee beams
  • Internal partition walls are made with light-weight hollow core wall panels instead of AAC blocks or bricks
  • Boundary walls, fencing poles, U-drainage or trenches, box culvert etc.

What is hollowcore concrete flooring and what is its lifespan?
Hollowcore slabs are precast, prestressed concrete elements that are generally used for flooring. Some of the advantages of using these flooring are longer lifespans and no propping, flexibility in designs, faster construction, lightweight structures, fire resistant structures, high load capacities and units manufactured specific to the project.
The maximum span of hollowcore floors will depend on the floor depth and the specific loadings imposed on the floor.

What are the quality standards followed while making precast shapes for any project?
Quality control is a very important aspect in the process of making precast concrete shapes. It is imperative to make precast shapes as per the exact requirement provided by the engineers and the construction party. To maintain the quality of product from our end,

  • We ensure there are quality control systems and procedures in place along with a quality assurance plan. Our programme consists of tests, trials, and general procedures for acceptance.
  • There is a laboratory and related facilities, which are required for the selection and control of the quality of materials and workmanship. The central quality laboratory is used for various quality control tests like cube test, workability test, slump test, sieve analysis etc. The materials used for making the final precast shapes also has to be shared for testing to various third-party laboratories with an advance intimation.
  • All the necessary tests are carried out in respective batching plants or sites depending on the use of concrete at our facility.
  • Documentation for all the tests conducted and their reports is maintained in records, for references and submission to the relevant authorities and the users of the same.

As precast use of concrete is conducted in a dedicated space and is in a monitored environment, it becomes easier to maintain high quality due to its repeatability factor. The necessary general precast machinery and moulds, steel tables, concrete batching and dispensing equipment, vibrating and finishing equipment and dedicated labour team help maintain the higher quality standards as compared to cast in-situ use of concrete.

How do you incorporate sustainability in the process of precasting?
Precast use of concrete promotes sustainability with its repeatability factor. There’s more planning involved in the process and equipment like the moulds, vibrating machine, finishing machine are all reusable elements of the process.
As mentioned, there is planning in precast use of concrete where only the required measure of concrete is mixed and poured into moulds that are made to precision as per the requirement of the project. The quantity is also previously defined, which means there is reduced to zero wastage of material.
This waste reduction leads to lesser needs of cleaning and clearing equipment, which may further be fueled by other energy sources. Thus, precast concrete, by large, is a sustainable means of building.

What are the advantages of using precast concrete?
There are multiple advantages of using a precast structure for any project like cost efficiency, speed, versatility, safety, sustainability and beauty.
This includes:

  • The use of precast improves the quality and lifespan of any building
  • It reduces the time of building, thus reducing the costs involved for all the other equipment and labour that goes in to the project, thus, proving to be cost effective
  • The maintenance of a precast is lower due to its high quality and durability that is ensured while it is cast
  • This method of using concrete is a sustainable option due to its repeatability

What are the major challenges you face in the process of making precast shapes and in their transportation?
The precast industry plays on volume and repetition. This is one of the major challenges as well.
The requirement of having to repeat the process
that contains a large volume of mixed concrete and getting the same perfection in the shapes is a cumbersome process.
The initial investment in setting up the precast plant and acquiring all equipment and moulds is high. With bulk shapes to be transported from one place to another and the requirement for site space and handling, this time of concrete use is more suitable for tier 2 and tier 3 cities.

How do precast elements or shapes help in the profitability of a construction activity?
As precast concrete is made at a different location than the construction site, the other jobs keep going on at the site and then the precast shapes are placed there. This reduces construction time to up to one-third to one-fifth as compared to cast in-situ concrete, thus, reducing cost of the construction.
Construction maintenance is reduced as the quality of their precast structures are monitored and carefully administered at the plant level. This means it adds to the reliability, durability, accuracy, and ability to produce architectural elements in any building adding to its quality and strength. Precast also provides insulation, thermal inertia and fire resistance and the possibility of integration with MEP (Mechanical, Electrical and Plumbing) from the start of the project.

How can precast concrete contribute towards affordable mass housing in India?
Defined shapes and technical requirements in precast concrete helps reduce the waste and increase the repeatability factor, thus, reduces the cost and time for any construction or building project. Higher control on quality, less time consumer leads to lesser need of labour and equipment on-site, which also adds to the profitability of the structure.
All factors combined bring down the overall cost of the project, leading to that benefit translating to the end consumer and bringing a surge of affordable mass housing in India.

-Kanika Mathur

Comparison Between Cast-in-situ (conventional method) versus Technology Drive Precast

Sr. No Criteria Conventional Construction Precast Construction 3D Modular/ Panel & Hollow Core Slab.
1 Natural resource consumption High 30 per cent saving
2 Labour Problem Heavy labour problem while work in progress Less labour required
3 Dependability on skilled labor 60 per cent Dependability
4 Time consuming Verv High Fast track
5 Initial investment Low High
6 Finishin Normal Excellent
7 Quality production Poor Excellent as factory based.
8 Material wastage High Least
9 Speed/ Productivity Low Excellent
10 Strength Good Excellent
11 Durability Low High
12 Structure weight/ Deed load Very heavy Reduced
13 Brick Block and Plastering Required No Need
14 Service like Electrical, plumbing & sanitary Break, Provide & Re-build Pre-embedded

Concrete

Jammu Division Begins First Cement Rail Traffic to Anantnag

Cement Loading From Kathua for Anantnag to Begin on September 14

Published

on

By

Shares



Jammu Railway Division has placed an indent for the first movement of cement by rail within the division, linking Shaheed Captain Sunil Kumar Choudhary Kathua Railway Station with Anantnag Railway Station. Loading for the consignment is scheduled to begin on September 14.

Continue Reading

Concrete

Hard Worker Wins Three Honours at Kyoorius Design Awards

Ramco Cements’ brand secures Grand Prix and two Blue Elephant honours.

Published

on

By

Shares



The Ramco Cements Limited’s construction chemicals brand, Hard Worker, has won three honours at the Kyoorius Design Awards 2026, including the Grand Prix – Grey Elephant in the Design in Action category.
The brand also secured two Blue Elephant honours, one for Design in Action and another for Packaging, recognising the design approach behind its brand identity and packaging.
Launched in 2025, Hard Worker entered the construction chemicals segment with the brand promise, “Hard-working products for hardworking people.” Its visual identity uses animals and birds to represent product benefits. The camel represents the water-retention capability of Hard Worker Eco Plaster, while the cheetah represents the speed and performance of Hard Worker Block Fix.
The visual language has been extended across packaging, retail, communication, literature, digital platforms and other brand touchpoints. Hard Worker uses bold colours, distinctive animal illustrations and simple visual storytelling to communicate product benefits across markets and audiences, including construction workers and applicators.
“For Hard Worker, design was never an afterthought. It was fundamental to how we wanted to build the brand. In a category that is largely functional, we wanted to create a brand that people could recognise, understand and remember instantly. The Kyoorius recognition is a wonderful validation of this design-led approach,” said Mr. AV Dharmakrishnan, CEO, The Ramco Cements Limited.
Mr. Balaji K. Moorthy, Executive Director – Marketing, Ramco Cements said “In a category where communication has traditionally been product-led and functional, we wanted Hard Worker to stand apart by making design an integral part of the brand experience. From the distinctive animal-led packaging to our communication across consumer and trade touchpoints, every element was designed to make the brand more memorable and the product benefits easier to understand.”
Within its first 12 months, Hard Worker crossed Rs 3.5 bn in sales. The latest recognition follows six honours secured by the brand’s campaign at the Kyoorius Creative Awards earlier in 2026, including the Grey Elephant Grand Prix for its Eco Plaster film.
The Kyoorius Design Awards recognise outstanding design work in India’s visual communications sector across multiple categories and platforms. The 2026 awards were announced on 12 September in Goa.
The Ramco Cements Limited is part of the Ramco Group and operates across cement and allied building-material solutions. Hard Worker is its construction chemicals brand, offering solutions across key construction applications.

Continue Reading

Concrete

Cement Firms to Invest Rs. 130 bn in Green Energy by FY28

Cement companies plan to expand clean energy capacity to 6 GW by FY28

Published

on

By

Shares



India’s major cement companies are set to raise their clean energy capacity to 6 GW by March 2028 from around 4 GW at the end of March 2026, according to ratings agency ICRA. The planned expansion is expected to involve investments of Rs. 130 bn over the next two years.

The additional capacity could generate annual savings of Rs. 62 bn to Rs. 67 bn, resulting in an estimated payback period of 1.8 to 2.2 years. Cement is an emission-intensive industry, and leading producers have established net-zero roadmaps covering the next 15 to 20 years.

The calcination process accounts for 57 to 60 per cent of the sector’s total emissions, while fuel combustion contributes 27 to 30 per cent and electricity consumption accounts for 10 to 13 per cent. ICRA said the figures highlighted the need for a broad decarbonisation strategy involving green power, blended cement, alternative fuels and improvements in clinker efficiency.

Green energy is considered one of the most commercially attractive decarbonisation options because it can reduce emissions while lowering operating costs. Every 5 per cent increase in green power replacement can reduce power and fuel costs by Rs. 15 to Rs. 16 per tonne. A 25 per cent replacement level could therefore save Rs. 75 to Rs. 80 per tonne and expand operating margins by 140 to 160 basis points.

Cement producers are also assessing carbon capture, utilisation and storage, although high implementation costs, energy requirements and limited transport and storage infrastructure are expected to slow commercial adoption. The government has proposed Rs. 200 bn over five years to support deployment across key sectors. Meanwhile, companies are targeting thermal substitution rates of 10 to 15 per cent over the next three to five years, compared with the current industry level of around 6 per cent.

Continue Reading

Video Thumbnail

    SIGN-UP FOR OUR GENERAL NEWSLETTER

    Trending News

    SUBSCRIBE TO THE NEWSLETTER

     

    Don't miss out on valuable insights and opportunities to connect with like minded professionals.

     


      This will close in 0 seconds