Humboldt Wedag India engineers a 9,500 TPD low-carbon clinker line for decarbonised cement production for Dalmia Cement.

Global decarbonisation targets and tightening environmental regulations are reshaping the cement industry. Leading producers are transitioning toward energy-efficient, low-emission technologies while maintaining high production capacity and operational reliability.
Dalmia Cement has committed to becoming a carbon-negative cement producer by 2040, supported by aggressive capacity expansion—from 49.5 MTPA to 75 MTPA by FY28 and 110–130 MTPA by 2031. Within this strategic roadmap, Project Green serves as a flagship initiative, combining scale with sustainability.
The project involves the installation of a 9,500 TPD clinker production line at Umrangso, designed with a strong focus on:
Best in class Thermal and Electrical energy consumption
High alternative fuel substitution rates
Reduced NOx and CO2 emissions
Integration with renewable energy systems
The focus while selecting plant and machinery was to have minimum thermal and electrical energy consumption and set a new benchmark in eco-friendly operations in terms of dust emission and meeting the standards of NOx emission. WHR was also envisaged along with the main plant and machinery in such a way that WHR is optimised by selecting energy-efficient technology in combination with maximum WHR potential.
The plant was commissioned in October 2025 after a gap of 24 months from the date of the start of civil construction work. The award of the main contract was effective from June 2023, and the start of construction was in September 2023.

Project technology and scope matrix
DCBL collaborated with Humboldt Wedag India (HWI) as a technology partner for capacity expansion project in the northeast region. The major equipment supplied by HWI includes an energy-efficient roller press system for raw material grinding, and a three-pier rotary kiln with a 9,500 tonnes per day (TPD) capacity. The pyro processing system integrates advanced technology from KHD, including a six-stage, double-string preheater with Low NOx-AF calciner designed for low NOx emissions, a high-capacity kiln of 9,500 TPD. The roller press system in finish mode has also been selected for raw material grinding, contributing to reliability, energy efficiency and quality.
KHD’s roller press technology is considered among the most energy-efficient grinding machines on the market. KHD’s pyro processing solutions, including the preheater, calciner, kiln and PyroJet burner, are engineered to provide optimal production capacity while limiting emissions and energy consumption. These advanced systems collectively enable high productivity, low carbon footprint, and reduced operational costs for cement plants.

Project overview and design philosophy
DCBL collaborated with Humboldt Wedag India as a technology partner for capacity expansion project. The primary objectives of Project Green include:
Development of a high-capacity, energy-efficient clinker line
Achievement of lower specific heat consumption
Reduction in specific power consumption
Maximisation of AFR substitution (35 per cent TSR potential)
Enabling WHR-based power generation
The design approach follows three core principles:
Efficiency first: Selection of proven high-efficiency equipment (roller press, HE-M pre-heater)
Fuel flexibility: System designed for wide AFR spectrum (biomass, RDF, industrial waste)
Future-readiness: Provision for chlorine bypass for higher TSR rates, de- carbonisation technology integration
Parameter Specification
System Capacity 2 × 350 TPH
Product Fineness 15% residue on 90 µ
Roller Press 2 × RP16-170/180
Installed Power 2 × 1600 kW
Dynamic Separator SKS LC 3750
Separator Air Volume 625,000 m³/hr
Bucket Elevator Capacity 1720 TPH

Parameter Specification
Clinker Capacity 9,500 TPD
Preheater 6-stage, Double String (90 HE 75)
Calciner Pyroclon Low NOx-AF
Calciner Dimensions Ø 7785 mm × 145 m
Rotary Kiln Ø 5.2 m × 82 m
Kiln Drive Power 1520 kW
Burner PyroJet Low NOx (522KO)

Technology highlight
When compared to other grinding options like ball mills and vertical roller mills (VRMs), the KHD roller press stands out as the most energy-efficient grinding system available in the cement industry. Key advantages of the KHD roller press include:
Energy efficiency: The roller press consumes significantly less power than both ball mills and VRMs, often saving 2-3 kWh/t of material compared to VRMs and much more relative to ball mills. Additionally, water spray is typically not used in the KHD roller press, eliminating the associated heat demand common with VRMs and thus increasing waste heat recovery potential.
Durability and maintenance: The roller press employs CHF lining on the roller surfaces, which greatly extends the component lifetime. The lifetime for these surfaces is longer than that of VRM components, reducing maintenance frequency and costs.
Layout design: The system incorporates a multifunctional V-separator and the latest generation dynamic SKS LC separator. These features enhance particle classification, improve grinding efficiency, and reduce dust nuisance through better engineering controls.
Operational benefits: The separation of grinding and classification in the system optimises energy use and throughput. Additionally, by avoiding water injection for bed stabilisation, the system reduces operational complexity and environmental impact.
Overall, the roller press grinding system achieves superior grinding efficiency, lower energy consumption, less wear, and better environmental performance compared to alternatives, making it a preferred choice for modern, sustainable cement production.
One of the notable features of the project is the KHD-designed latest generation low-pressure drop ’HE-M’ pre-heater cyclones, engineered for maximum gas–solid separation efficiency. Their optimised geometry ensures a low-pressure drop, directly improving the overall draft profile of the system.
By reducing system resistance, the preheater design lowers fan power consumption and enhances the stability of kiln draft and gas-flow distribution.
This efficiency translates into lower operating costs, reduced energy demand, and improved clinkerisation performance. The result is a preheater tower that reflects the hallmark of KHD’s engineering expertise — robust, reliable, and highly energy-efficient. PYRO-JET® Burner.
Technological changes are one of the ways of reducing greenhouse gas emissions and other general emissions from the cement industry. By using the Pyrojet burner, which is highly efficient in terms of low primary air quantity, low NOx emission, and reduced specific heat consumption. Three to five per cent less primary air consumption in comparison to other burners, which is equivalent to saving approximately 4 kcal/kg clinker.
One of the most imperative features of the PYRO-JET® burner is the flame characteristics. The PYRO-JET® burner generates short and stable flame, which results in less structural growth of C3S and C2S. Alite crystal size will therefore be smaller. Due to the smaller alite crystal size, the clinker becomes easy to grind. Also, due to short and stable flame, the formation of C3S is more in comparison to other burners, which results in higher early strength of the product and thus more fly ash can be added when manufacturing blended cement.
By minimising the primary air and transport air Pyro jet burners have reduced greenhouse gas emissions and other general emissions from the cement industry

AFR Utilisation
Pyroprocess system has been designed to integrate alternative fuels and raw materials (AFR) as part of its sustainability agenda. The system successfully co-processes both solid and liquid AFRs, achieving a Thermal Substitution Rate (TSR) of 35 per cent on a sustained basis.
Solid AFR mix of various kinds, including RDF, rice husk, palm fibre, with a combined NCV of ~2200-2300 kcal/kg, is used to replace conventional fossil fuels in the kiln partially.
The balanced use of solid and liquid AFR not only reduces dependence on non-renewable fuels but also lowers CO2 emissions and operating costs, reinforcing DCBL’s commitment to carbon neutral by 2040.

The operational results of the pyroprocess system, raw grinding system are presented in Tables 1 & 2. The primary objective of implementing raw grinding and pyroprocess was to achieve significant reductions in electrical energy consumption when compared to conventional alternatives. This objective has been successfully accomplished, as evidenced by the operational data. In addition to the energy savings, the recorded production outputs from all systems have consistently surpassed the originally guaranteed performance parameters. This demonstrates not only the reliability and efficiency of the installed systems but also validates the technological choice made for process optimisation and cost reduction.

Conclusion
Project Green represents a holistic transformation of clinker production, combining scale, efficiency and sustainability. The integration of advanced pyro processing systems, energy-efficient grinding, AFR utilisation and WHR makes it a benchmark for next-generation cement plants.
The DCBL–HWI collaboration highlights how engineering innovation can deliver:
Reduced environmental impact
Improved operational efficiency
Long-term sustainability
This project sets a replicable model for future cement plants aiming to transition toward carbon-neutral or carbon-negative production.

Raw Material Grinding System
The raw grinding circuit employs Roller Press (RP) technology in a finish grinding mode.
Pyro processing System
The pyro line represents the core of Project Green, designed for maximum thermal efficiency and operational flexibility.

Concrete

Cement Prices Likely to Rise Rs. 10-15 per Bag from Mid-October

Input costs and steady demand may drive cement price increases

Published

on

By

Shares



Cement manufacturers in India are likely to raise prices by Rs. 10-15 per bag from mid-October, as they seek to offset persistent increases in power and fuel costs. Emkay Research said its channel checks indicated a high probability of an increase from October 12, supported by the start of the busy construction season and favourable demand-supply conditions.

The sector had implemented similar rate adjustments of Rs. 10-15 per bag during the first quarter, but the increases were insufficient to cover higher operating costs. Prices also softened during July and August because of the monsoon, widening the gap between realisations and input expenses. Delayed plant expansion programmes have pushed clinker utilisation rates towards 79 per cent by FY28, helping to balance market fundamentals.

Emkay Research said steady volume offtake was supporting cement consumption, with non-trade demand driving activity across regional markets. Industry volumes are expected to grow by 7-8 per cent year on year during the first half of FY27, while demand momentum is projected to remain firm over the following 18 months. The outlook includes the busy construction season in the second half of FY27 and infrastructure activity linked to general elections in the first half of calendar year 2029.

The brokerage expects overall cement demand to record a compound annual growth rate of about 7 per cent between FY26 and FY28. However, elevated operating expenses are likely to continue weighing on profitability. Input costs have risen by Rs. 300-400 per t over the past six to seven months, with the full impact expected to become visible in second-quarter earnings and remain persistent through the second half of FY27.

Spot prices for petcoke and imported coal are approximately 20 per cent and 16 per cent above their second-quarter averages, at USD 175 per t and USD 150 per t, respectively. Packing costs have also increased, with polypropylene granule prices rising above Rs. 135 per kg. Emkay Research estimated that second-quarter earnings could decline by Rs. 200-250 per t sequentially because of higher fuel bills and negative operating leverage, and said the sector requires sustained price increases of about Rs. 10 per bag to offset cost inflation.

Continue Reading

Concrete

Nuvoco Marks 10 Years, Targets 35 MMTPA Capacity by FY28

Nuvoco celebrates a decade of growth, targeting 35 MMTPA cement capacity by FY28.

Published

on

By

Shares



Nuvoco Vistas Corporation Limited is celebrating a decade of operations under the theme ‘Dus Saal Bemisaal’, highlighting its expansion in India’s building materials sector. The company has grown from a single cement manufacturing facility into a diversified organisation operating across cement, ready-mix concrete (RMC) and modern building materials.
The company’s journey began in 2014 when its parent, Nirma Group, commissioned a 2 million metric tonnes per annum (MMTPA) greenfield cement plant at Nimbol, Rajasthan. A major milestone followed in October 2016 with the acquisition of Lafarge India, significantly expanding its manufacturing footprint.
Nuvoco strengthened its market presence through the acquisition of Emami Cement, now NU Vista Limited, in 2020, followed by its public listing in 2021. In April 2025, the company added Vadraj Cement to its portfolio, strengthening its presence in western India.
Nuvoco has an operating cement capacity of 27 MMTPA and 14 manufacturing units, including the Kutch and Sachana facilities in Gujarat, which are in advanced stages of completion. It also operates 58 ready-mix concrete plants across India and offers a range of modern building materials.
The company aims to increase its cement capacity to 35 MMTPA by FY2027-28, representing approximately 15-fold growth over the decade.
Reflecting on the milestone, Hiren Patel, Chairman, Nuvoco Vistas Corporation Limited, said, “From our beginnings at Nimbol to the organisation we are today, every milestone has added a new chapter to Nuvoco’s journey and strengthened our belief in building for the long term.”
The company continues to focus on capacity expansion, operational efficiency, innovation and sustainability while strengthening its position in India’s construction materials market.

Continue Reading

Concrete

J&K Government Notifies City Gas Distribution Policy

Policy targets PNG and CNG expansion across all 20 districts

Published

on

By

Shares



Jammu and Kashmir government has notified the City Gas Distribution (CGD) Policy, 2026, following its approval by the Council of Ministers headed by Chief Minister Omar Abdullah. The policy sets out a phased framework for expanding Piped Natural Gas (PNG) and Compressed Natural Gas (CNG) access for households, businesses, industries and the transport sector across the Union Territory.

CGD networks will be expanded in phases across all 20 districts, with the aim of bringing reliable natural gas closer to consumers and supporting a gradual shift from conventional fuels. The government said the policy is designed to improve energy access while creating an investor-friendly and time-bound environment for gas distribution projects.

The policy provides for single-window and time-bound clearances, streamlined procedures for setting up CNG stations and standardised norms for the Right of Way. These measures are intended to reduce procedural delays, simplify project implementation and facilitate investment in natural gas infrastructure.

It also prioritises gas connectivity for major industrial estates, including those in Kathua, Samba and Pulwama. Improved access to natural gas is expected to support industrial activity, enhance energy efficiency and help businesses manage fuel costs, while strengthening their competitiveness and encouraging investment in the clean-energy sector.

The policy is also expected to create opportunities for local employment, apprenticeships and skill development in the construction, operation and maintenance of gas distribution networks and related services. Abdullah described the measure as an important step towards cleaner growth, sustainable development and a modern energy ecosystem in Jammu and Kashmir, saying it would expand reliable energy access and support industry and investment.

Continue Reading

Video Thumbnail
▶

    SIGN-UP FOR OUR GENERAL NEWSLETTER

    Trending News

    SUBSCRIBE TO THE NEWSLETTER

     

    Don't miss out on valuable insights and opportunities to connect with like minded professionals.

     


      This will close in 0 seconds