Safe plant concept means safety of the entire workforce

Published

on

Shares

Ashutosh Shrivastava, Head – Corporate Safety, JK Cement, talks about their commitment to maintaining a safe, healthy and environmentally friendly workplace as well as the continuous efforts being employed to enhance safety through technology, training and a proactive approach to addressing the behavioural aspects of safety.

What is the definition of a ‹safe› plant in your organisation?
Safe plant concept means safety of the entire workforce, including both employees and visitors coming to the plant for their respective nature of activity, by taking appropriate safety control measures as per the risk associated with the activity.

Tell us about the key areas where safety in a cement plant is of paramount importance?
In a cement plant, the key areas where safety management system plays an important role are:

  • Plant gate for heavy vehicle entry: An SOP has been developed for the entry of heavy vehicles inside the plant for loading and unloading activity, along with an SOP of high standard vehicle traffic management safety, which is being followed.
  • Packing plant area: In the cement industry, the maximum workforce involved is at the packing plant operation, as the major activity of cementing bags and loading them onto vehicles by using conveyor belts at loading points is being undertaken. For safe loading operations, an SOP has been developed. The SOP Task Risk Assessment is conducted and applied along with safety control measures, based on activity SOP.
  • Process area: To maintain safe process operations, various associated activities are carried out. For example:
  • Hot material handling: Poking and cyclone jam cleaning activities at preheater and kiln locations, etc.
    Hot work: Naked flame producing activity (welding / grinding / gas cutting)
    Working at height activity: Work at 1.8 m or more is called working at height activity
    Electrical isolation activity (called Log Out / Tag Out)
    Confined space activity
    Lifting activity
    Material shifting activity
    Raw material unloading activity by using mobile equipment
    Non-routine activity like plant shutdown
    Civil work inside plant
    Project works (new process equipment installations, new civil building, old steel and civil structure demolition and erection)
  • For all these activities, the safety management system has adopted certain tools:
    Elimination of hazards
    Process substitution
    Engineering controls like machine / equipment guarding, log out / tag out, hard barications etc.
    Administrative controls like permit to work system for high risk activities, Activity SOPs/OCP, activity risk assessment, job specific safety training, tool box talks, workplace safety inspection, safety observation tours, hazards reporting, near-miss and incident reportings, safety meetings, etc.
  • What are the safety equipment used by the personnel in different areas of work?
  • Since there are different types of activities going on inside a cement plant, based on a specific activity, the workforce uses personal protective equipment (PPE) and other safe design equipment, such as:
  • Hot works (welding / grinding / gas cutting): Heat resistance suit, hot work safety hand gloves, face shields, hot works safety goggles, safety helmet, safety shoes, gas cylinders pressure gauge, flash back arrestors, fire hydrant line, fire extinguishers, etc.
  • Height works: Full body safety harness with double lanyard with shock absorber, life line, safe design scaffolding platform, boom lift, scissor lift, cherry picker, safety goggles, safety helmet, safety shoes, job specific safety hand gloves, etc.
  • Hot material handling activity: Full body heat resistance suit, hot material handling safety gloves, heat resistance safety shoes, heat resistance face shield, fire hydrant line, fire extinguishers, etc.
  • Confined space works: Use of gas detectors, forced ventilation system, life line. rescue equipment, electrical isolation system (log out / tag out), safety goggles, safety helmet, safety shoes, job specific safety hand gloves and nose mask.
  • Electrical works: Electrical isolation system (log out / tag out), safety goggles, electrical job specific safety helmet, electrical job specific safety shoes, electrical job specific safety hand gloves, electrical job specific face hood, electrical shock resistance suit, etc.
  • Lifting activity: Third party approved lifting tools and tackles and third party approved mobile equipment (mobile cranes).
  • Material shifting activity by using mobile cranes: Third party approved lifting tools and tackles, third party approved mobile equipment (mobile cranes, fork lift, etc).

Tell us about your organisation’s policies about safety for people working in the plants?
Summary of the company’s Safety, Health and Environment Policy:

  • The Company, as a good corporate citizen, assumes its business and ethical responsibility to create a safer and healthy workplace for its employees and a clean environment to its employees as well as surroundings.
  • With the company›s global vision, we aspire for the highest international standards in plant design, equipment section, maintenance and operation, which are consistent with its emerging leadership position in cement business, the company will constantly encourage higher international standards in all areas including safety, health and environment.
  • The Company as a part of its corporate philosophy and policy is committed to manufacture products safely and in an environment-friendly manner with due consideration for occupational health for employees and others who may be involved and / or affected by its operation.
  • The company will comply with all applicable laws and regulations (local /state/federal) pertaining to its operations.
  • The Company widely participates with the government, the industry and others concerned in creating relevant laws, regulations and standards to safeguard the community, workplace and environment.
  • The Company is committed to the safety and health of the surrounding community at each manufacturing site and will make sure that any adverse environmental impact is minimised.
  • The Company will provide adequate resources for the implementation and monitoring of safety policy.
  • Each site and department will have this policy prominently displayed so as to bring it to the attention of all employees.

Does technology play a role in ensuring plant safety? If yes, how?
The technology used for safety purposes at JK Cement comprises:

  • Digital safety management system module, which includes permit to work system, workplace hazard reporting and investigation, workplace near-miss reporting and investigation, workplace safety observation tour, safety statistics analysis, etc.
  • Fire / smoke detectors installations at fire risk areas (reference AFR operation, bag go down, etc.) and connected with the emergency control room.
  • Digital Control System (DCS) to control and monitor plant operations.
  • Nitrogen Purging System installation at process equipment (reference coal fine bins, liquid AFR installation, etc.)
  • Temperature sensors installation in different equipment.
  • Gas Detection Monitoring by using multi gas detectors for confined space activity.
  • CCTV cameras installed at multiple locations.
  • GPS installation in company vehicles, etc.
  • Tell us about the major challenges faced in ensuring plant safety?
  • In the cement industry, the major challenge that we are facing is the behaviour of the workforce towards safety. To deal this challenge, we have developed safety management system tools that include:
  • Safety Awareness Tool (safety induction, activity tool box talks, job specific safety training, monthly safety campaign and circulation incident-based safety alert).
  • Safety Inspection Tool (behaviour-based safety observation tour, workplace safety round, focus internal safety audit and external safety audit).
  • Reporting Tool (near miss reporting, hazard reporting and incident reporting).
  • Emergency Preparedness Tool (mock drills, onsite emergency plan, fire fighting equipment facility and medical emergency facility).
  • Risk Assessment Tool (job safety analysis, hazard identification and risk assessment).
  • Safety Observation Discussion Platform Tool (monthly safety review meeting, management representative and workers representative safety committee meeting and daily all plants manufacturing meeting).
  • Safety Guidelines Tool (Activity SOP / OCP, safety hand book, contractor obligation and OHS guidelines and activity dos and don’ts).
  • Workplace Safety Display Tool (activity safety display and activity SOP display).
  • Administrative Control Tool (risky activity permit to work system).
  • Incident Investigation Tool (root cause analysis, CAPA and safety recommendation).


Do you conduct safety training and audits for your plant personnel? Explain in detail.
Workplace Safety Trainings and Safety Audits are an important tool of safety management system:
Safety Awareness Tools:

  • Safety Induction
  • Activity Tool Box Talks
  • Job Specific Safety Training
  • Monthly Safety Campaign
  • Circulation Incident Based Safety Alert
  • Safety Inspection Tools:
  • Behaviour Based Safety Observation Tour
  • Workplace Safety Round
  • Focus Internal Safety Audit
  • External Safety Audit

How do you plan to better the safety of your plant in the years to come?
We have prepared a focus safety element plan for the coming years to reach the next level of safety system at JK Cement.
Focus safety elements are:

  • Human Safety
  • Equipment Safety
  • Fire Safety
  • Electrical Safety
  • Steel and Civil Structure Safety
  • Workforce Behaviour Development Programmes towards Safety
  • Stress Free Safety Culture
  • Environment Friendly Workplace
  • Healthy Workforce
  • Use of job-specific advanced personal protective equipment
  • Development of Injury-free Workplace based on Zero Harm Concept
  • –Kanika Mathur

Concrete

Nuvoco Marks 10 Years, Targets 35 MMTPA Capacity by FY28

Nuvoco celebrates a decade of growth, targeting 35 MMTPA cement capacity by FY28.

Published

on

By

Shares



Nuvoco Vistas Corporation Limited is celebrating a decade of operations under the theme ‘Dus Saal Bemisaal’, highlighting its expansion in India’s building materials sector. The company has grown from a single cement manufacturing facility into a diversified organisation operating across cement, ready-mix concrete (RMC) and modern building materials.
The company’s journey began in 2014 when its parent, Nirma Group, commissioned a 2 million metric tonnes per annum (MMTPA) greenfield cement plant at Nimbol, Rajasthan. A major milestone followed in October 2016 with the acquisition of Lafarge India, significantly expanding its manufacturing footprint.
Nuvoco strengthened its market presence through the acquisition of Emami Cement, now NU Vista Limited, in 2020, followed by its public listing in 2021. In April 2025, the company added Vadraj Cement to its portfolio, strengthening its presence in western India.
Nuvoco has an operating cement capacity of 27 MMTPA and 14 manufacturing units, including the Kutch and Sachana facilities in Gujarat, which are in advanced stages of completion. It also operates 58 ready-mix concrete plants across India and offers a range of modern building materials.
The company aims to increase its cement capacity to 35 MMTPA by FY2027-28, representing approximately 15-fold growth over the decade.
Reflecting on the milestone, Hiren Patel, Chairman, Nuvoco Vistas Corporation Limited, said, “From our beginnings at Nimbol to the organisation we are today, every milestone has added a new chapter to Nuvoco’s journey and strengthened our belief in building for the long term.”
The company continues to focus on capacity expansion, operational efficiency, innovation and sustainability while strengthening its position in India’s construction materials market.

Continue Reading

Concrete

J&K Government Notifies City Gas Distribution Policy

Policy targets PNG and CNG expansion across all 20 districts

Published

on

By

Shares



Jammu and Kashmir government has notified the City Gas Distribution (CGD) Policy, 2026, following its approval by the Council of Ministers headed by Chief Minister Omar Abdullah. The policy sets out a phased framework for expanding Piped Natural Gas (PNG) and Compressed Natural Gas (CNG) access for households, businesses, industries and the transport sector across the Union Territory.

CGD networks will be expanded in phases across all 20 districts, with the aim of bringing reliable natural gas closer to consumers and supporting a gradual shift from conventional fuels. The government said the policy is designed to improve energy access while creating an investor-friendly and time-bound environment for gas distribution projects.

The policy provides for single-window and time-bound clearances, streamlined procedures for setting up CNG stations and standardised norms for the Right of Way. These measures are intended to reduce procedural delays, simplify project implementation and facilitate investment in natural gas infrastructure.

It also prioritises gas connectivity for major industrial estates, including those in Kathua, Samba and Pulwama. Improved access to natural gas is expected to support industrial activity, enhance energy efficiency and help businesses manage fuel costs, while strengthening their competitiveness and encouraging investment in the clean-energy sector.

The policy is also expected to create opportunities for local employment, apprenticeships and skill development in the construction, operation and maintenance of gas distribution networks and related services. Abdullah described the measure as an important step towards cleaner growth, sustainable development and a modern energy ecosystem in Jammu and Kashmir, saying it would expand reliable energy access and support industry and investment.

Continue Reading

Concrete

JSW Cement Commissions 1 MTPA Grinding Unit at Nagaur

Nagaur unit lifts JSW Cement’s grinding capacity to 25.10 MTPA

Published

on

By

Shares



JSW Cement has commissioned an additional 1 MTPA grinding unit at Nagaur in Rajasthan. MTPA refers to million tonnes per annum. The commissioning has increased the company’s total cement grinding capacity to 25.10 MTPA, while its total clinker manufacturing capacity, including capacity at its joint venture JSW Cement FZC, stands at 9.74 MTPA.

The company began operations in North India in March 2026 with the Nagaur Integrated Plant, which comprised a 3.30 MTPA clinkerisation unit and a 2.50 MTPA cement grinding unit. Following the latest commissioning, the plant’s total cement grinding capacity has risen to 3.50 MTPA.

The expanded facility is expected to strengthen JSW Cement’s ability to serve cement demand across Rajasthan, Haryana, Punjab and the National Capital Region. The project has been funded through a combination of equity and long-term debt, according to the company.

During the quarter ended 30 September 2026, JSW Cement also commissioned an Alternate Fuel Handling System and a Waste Heat Recovery System (WHRS) at the Nagaur Integrated Plant. The company said the additions formed part of its broader effort to improve operational efficiency at the facility.

Nilesh Narwekar, chief executive officer of JSW Cement, said the additional grinding capacity was a strategic priority that would support the company’s expansion in North India. He added that the unit had been commissioned within the expected timeline, reflecting the company’s project execution capabilities, and that the alternate fuel and waste heat recovery systems were expected to substantially reduce production costs going forward.

Continue Reading

Video Thumbnail
▶

    SIGN-UP FOR OUR GENERAL NEWSLETTER

    Trending News

    SUBSCRIBE TO THE NEWSLETTER

     

    Don't miss out on valuable insights and opportunities to connect with like minded professionals.

     


      This will close in 0 seconds