Connect with us

Economy & Market

Boosting Concrete Workability with Grinding Aids

Published

on

Shares

Dr SB Hegde highlights how AdoCem® WE++ grinding aid improves cement fineness and reduces water demand, effectively minimising slump loss and enhancing concrete workability retention. The study confirms its role in improving both slump retention and compressive strength over time.

In the production of concrete, maintaining consistent workability is crucial for efficient mixing, transporting, and placing of the material. However, concrete slump loss, or the reduction in workability over time, is a common challenge, particularly in large-scale projects where the concrete mix needs to remain workable for extended periods, such as during long-distance transportation or complex placements. Slump loss greater than 150 mm within 3 hours can lead to difficulties in handling and finishing, impacting both the quality and the efficiency of construction.
One effective solution to control slump loss is the use of grinding aids during the cement production process. This technical note focuses on the application of AdoCem® WE++ grinding aid during the cement grinding of Ordinary Portland Cement (OPC) to resolve slump loss issues and improve concrete workability retention.

The role of AdoCem® WE++ grinding aid
AdoCem® WE++ is a high-performance grinding aid designed to improve the efficiency of cement grinding by reducing the energy required to achieve a desired fineness. It works by modifying the surface properties of cement particles, reducing agglomeration, and improving the flowability of the material. As a result, it enhances the production process, reduces specific energy consumption, and improves the overall quality of the cement.
In addition to its primary function in cement grinding, AdoCem® WE++ has been shown to have beneficial effects on the physical properties of the cement, particularly in terms of workability and water demand in concrete mixes. By optimising the cement particle size distribution, the grinding aid can reduce water requirements, resulting in better workability retention and lower slump loss over time.

Slump loss problem in concrete
Concrete slump loss is a significant issue
that affects the workability of fresh concrete. Over time, fresh concrete tends to lose its fluidity, which can lead to challenges in handling and placing the mix. The rate of slump loss is influenced by several factors, including:

  • Cement fineness: Finer cement particles tend to absorb more water, requiring higher water-to-cement ratios to maintain a constant slump. This leads to increased slump loss.
  • Cement composition: The chemical composition and particle size distribution of the cement affect hydration rates and, consequently, the workability over time.
  • Environmental conditions: Temperature, humidity, and mixing conditions also play a critical role in slump retention.

In this context, the introduction of AdoCem® WE++ grinding aid helps optimise cement properties, ensuring that the water demand is minimised and workability is better maintained over an extended period, thereby mitigating slump loss.

Research methodology 4.1 Materials

  • Cement: Ordinary Portland Cement (OPC) was used in this study.
  • Grinding aid: AdoCem® WE++ was used as the grinding aid, added at dosages of 0.06 per cent, 0.08 per cent, and 0.10 per cent by weight of cement.
  • Concrete mix: A standard concrete mix with a water-to-cement ratio of 0.50 was prepared. The target slump was 150 mm, with slump loss measurements taken at intervals up to 3 hours.

4.2 Experimental setup

  • Cement grinding: OPC was ground in a ball mill, with the addition of AdoCem® WE++ at the specified dosages. The energy consumption, fineness, and particle size distribution of the cement were analysed.
  • Concrete mix preparation: Concrete was mixed using cement treated with AdoCem® WE++ grinding aid, along with conventional mixing procedures.
  • Slump testing: Slump was measured using the standard slump cone test at 0, 30, 60, 90, and 180 minutes after mixing to determine the rate of slump loss.
  • Compressive strength: Concrete cubes (150 mm x 150 mm) were cast, cured, and tested at 7, 28, and 90 days to assess the impact of grinding aids on strength development.

Results and discussion
5.1 Cement fineness and energy consumption
The use of AdoCem® WE++ significantly improved the grinding efficiency, resulting in a more uniform particle size distribution. The cement treated with AdoCem® WE++ showed a Blaine fineness of 320 m²/kg, compared to 300 m²/kg for the control cement, indicating that the grinding aid allowed for finer grinding without increasing energy consumption. This reduced the production costs while improving cement quality.

5.2 Slump retention
The main focus of this study was to evaluate the effect of AdoCem® WE++ on slump retention. Concrete mixes with grinding aid-treated cement showed a notable improvement in slump retention over time compared to the control mix.

  • Control cement (no grinding aid): The control mix experienced a slump loss of 80 mm after
    2 hours.
  • AdoCem® WE++ at 0.06 per cent dosage: Concrete with cement treated with 0.06 per cent AdoCem® WE++ showed a slump loss of 100 mm after 3 hours, a significant improvement over the control mix.
  • AdoCem® WE++ at 0.08 per cent dosage: At a dosage of 0.08 per cent, the slump loss was reduced to 120 mm after 3 hours, demonstrating further improvement.
  • AdoCem® WE++ at 0.10 per cent dosage: The highest dosage of AdoCem® WE++ resulted in the best performance, with only a 150 mm slump loss after 3 hours, which meets the target of maintaining workability over extended periods.

5.3 Hydration behaviour and setting time
The addition of AdoCem® WE++ appeared to slightly delay the initial setting time compared to the control mix. This delay in setting time helps to extend the period during which the concrete remains workable, thereby reducing the risk of excessive slump loss. The improved hydration behaviour
also contributed to better overall consistency in the concrete mix.

5.4 Compressive strength
Concrete cubes made with cement treated by AdoCem® WE++ exhibited slightly higher compressive strength compared to the control mix. At 28 days, the compressive strength of the AdoCem® WE++ mixes were 5 per cent to 8 per cent higher, indicating that the grinding aid not only improved workability but also contributed to more efficient cement hydration and stronger concrete.

Conclusion
The addition of AdoCem® WE++ grinding aid during the cement grinding process significantly improves the workability retention of concrete, effectively maintaining slump loss over a 3-hour period. By optimising the particle size distribution of cement, AdoCem® WE++ reduces water demand and enhances the stability of the concrete mix, thereby ensuring that the slump remains within the desired range (150 mm) for an extended period. Furthermore, the grinding aid improves cement efficiency, reduces energy consumption during grinding, and enhances the strength development of concrete.
This study demonstrates that AdoCem® WE++ is an effective solution for mitigating concrete slump loss, making it a valuable tool for construction projects where concrete workability must be maintained over longer periods. The optimal dosage of AdoCem® WE++ for achieving the best performance in terms of slump retention and strength is around 0.1 per cent by weight of cement.

About the author:
Dr SB Hegde, a global cement industry leader with over 30 years of experience, is a Professor at Jain College of Engineering, India, and a Visiting Professor at Pennsylvania State University, USA.

Concrete

Wonder Cement appoints Mahesh Singh as VP Corporate Brand Communication 

Published

on

By

Shares

Singh brings 20+ years of brand and marketing experience, and will lead integrated corporate brand communication initiatives at Wonder Cement 

New Delhi

Wonder Cement, a leading cement manufacturer, has appointed Mahesh Singh as Vice President – Corporate Brand Communication. In his new role, he will oversee corporate brand strategy and communication, including digital and performance marketing, public relations, trade, events, exhibitions, sports and experiential marketing. 

Singh brings over two decades of experience across marketing and communications, with roles spanning the automotive industry, agencies and entrepreneurship. He spent more than a decade with Honda Motorcycle & Scooter India, working across integrated communication, media, digital, retail and consumer engagement. His stint also included helping build the company’s digital marketing capabilities. 

He moved to dentsu X India as Vice President – Strategy & Planning, working across categories such as automotive, auto components, electric vehicles, FMCG, consumer electronics, BFSI, apparel and brand consulting. His responsibilities included media and marketing strategy, product launches, content, performance marketing and consumer activations. 

Singh subsequently took an entrepreneurial route with Radiant Brands before joining Shriram Ltd (SPR Autotech) as Head – Marketing & Communications. There, his remit included brand and corporate strategy, communications, PR and ORM, retail identity, loyalty programmes and events. 

At Wonder Cement, Singh will be responsible for bringing together the company’s corporate brand communication initiatives across digital, performance marketing, PR, trade, sports and experiential platforms. The role will focus on creating an integrated approach to communication across consumers, trade partners and other key stakeholders. 

The appointment brings to Wonder Cement a marketer whose career has spanned the brand, agency and entrepreneurial sides of the communications ecosystem. 

Wonder Cement, part of the RK Group, is a cement manufacturer with roots in Rajasthan and a focus on quality, trust and transparency. The company has grown to six manufacturing plants, and a cement capacity of 21.5 MTPA. With more than 2,000 employees and a network of over 5,000 dealers, its operations span manufacturing, distribution and customer engagement, with a focus on consistent product quality and efficient execution. 

Continue Reading

Concrete

JSW Cement commissions additional 1 MTPA grinding unit at Nagaur

Published

on

By

Shares

With this commissioning, JSW Cement’s total cement grinding capacity has increased to 25.10 MTPA, 
Mumbai

JSW Cement, one of India’s leading green cement producers and part of the diversified JSW Group, today announced the successful commissioning of an additional 1.00 MTPA cement grinding unit at Nagaur, Rajasthan. The commissioning marks another significant milestone in the Company’s growth strategy.

With this commissioning, JSW Cement’s total cement grinding capacity has increased to 25.10 MTPA, while its total clinker manufacturing capacity, including clinker capacity at its joint venture, JSW Cement FZC, stands at 9.74 MTPA.

JSW Cement had commenced operations in North India in March 2026 with the Nagaur Integrated Plant, comprising a 3.30 MTPA clinkerisation unit and 2.50 MTPA cement grinding unit. With the commissioning of the additional 1.00 MTPA cement grinding unit, the plant’s total cement grinding capacity has increased to 3.50 MTPA, enhancing the company’s ability to cater to the growing cement demand across Rajasthan, Haryana, Punjab and the National Capital Region (NCR). The expansion has been funded through a strategic mix of equity and long-term debt.

During the quarter ended 30th September 2026, JSW Cement has also commissioned the Alternate Fuel Handling System and the Waste Heat Recovery system (WHRS) at the Nagaur Integrated Plant.

Nilesh Narwekar, CEO, JSW Cement, said: “The commissioning of additional 1.00 MTPA grinding capacity at Nagaur is a key strategic priority for us and will accelerate JSW Cement’s expansion into North India. We look forward to servicing the growing needs of the region and contributing to the economic growth of Rajasthan, Haryana, Punjab and the NCR area. I am delighted to share that the company has commissioned this grinding unit within the expected timeline, showcasing our project execution capabilities. Further, the Alternate Fuel Handling System and the Waste Heat Recovery system (WHRS) are expected to substantially reduce our production costs going forward.”

Continue Reading

Concrete

UltraTech becomes first Indian cement firm to cross 2 GW green energy

Published

on

By

Shares

UltraTech Cement has crossed 2 GW of captive green energy capacity, with renewables and waste heat recovery meeting 48 per cent of its power needs.

Mumbai

UltraTech Cement Limited has surpassed 2 GW of installed green energy capacity for captive use, becoming the first cement company in India to achieve the milestone. The Aditya Birla Group company commissioned 116.55 MW of wind capacity at its Inter-State Transmission System-connected wind-solar hybrid project in Barmer, Rajasthan, along with 10 MW of Waste Heat Recovery System capacity at Sarlanagar Cement Works in Karnataka.

With these additions, UltraTech’s cumulative installed green energy capacity has reached 2,024 MW. This includes 1,580 MW of renewable energy capacity and 444 MW of waste heat recovery capacity, together meeting around 48 per cent of the company’s current power requirements.

The company said the milestone reflects the progress of its long-term energy transition strategy. In FY27 so far, nearly one-third of UltraTech’s 76 manufacturing units in India have maintained green energy utilisation above 50 per cent of their electricity requirements, while five units have crossed 95 per cent.

K C Jhanwar, Managing Director, UltraTech Cement Limited, said, “Crossing the 2 GW green energy milestone is the result of a strategy we have pursued consistently over the past decade. Cement is an energy-intensive, hard-to-abate sector, and showing that reliability and growth can go hand in hand with a rapid shift to green energy sets a benchmark for the industry. With nearly half of our power needs now met through green energy, we are significantly less exposed to fossil fuel supply constraints and power price volatility. As we scale up renewables, waste heat recovery and battery storage across our operations, we are building an energy foundation for stable, long-term growth.”

UltraTech commissioned 430 MW of green energy capacity in FY26 and continues to expand its renewable energy and waste heat recovery portfolio.

The company is also progressively integrating Battery Energy Storage Systems across its operations to improve renewable energy utilisation and supply reliability.

In 2025, UltraTech operationalised what it described as India’s first on-site hybrid round-the-clock renewable energy project at Sewagram Cement Works in Gujarat. The project combines solar, wind and battery storage.

As part of its decarbonisation strategy, UltraTech said it has not invested in new captive thermal power capacity for either greenfield projects or brownfield expansions at its integrated units for more than a decade.

The company said its expanding green energy portfolio is helping reduce dependence on conventional grid electricity and fossil fuel-based power, while lowering exposure to fluctuations in coal and electricity prices.

UltraTech aims to increase green energy’s share in its total power mix to 85 per cent by 2030. As a member of RE100, it has also committed to meeting 100 per cent of its electricity requirement through renewable sources by 2050.

UltraTech Cement, the cement flagship of the Aditya Birla Group, has a total grey cement capacity of 210.1 MTPA and white cement and putty capacity of 3.5 MTPA. The company is also a signatory to the GCCA Climate Ambition 2050 and has committed to the GCCA Net Zero Concrete roadmap.

Continue Reading

Video Thumbnail
▶

    SIGN-UP FOR OUR GENERAL NEWSLETTER

    Trending News

    SUBSCRIBE TO THE NEWSLETTER

     

    Don't miss out on valuable insights and opportunities to connect with like minded professionals.

     


      This will close in 0 seconds