Connect with us

Concrete

How Upgrades Can Deliver Energy Savings Across the Cement Process

Published

on

Shares

Jacob Brinch-Nielsen, Vice President of Professional Services, FLSmidth Cement, brings together recommendations from experts across the flow sheet to demonstrate the role of upgrades in optimising the cement manufacturing process.

Improving energy efficiency in material transport
Pneumatic conveying offers a cleaner and more contained alternative to mechanical conveying. However, pneumatic systems can also be energy-intensive, with inefficiencies arising from air leakage, pressure losses, and outdated equipment designs. Optimising these systems can significantly reduce energy consumption and operating costs.
“One major challenge is maintaining efficient air-to-material ratios, as excessive air use leads to unnecessary power consumption,” explains Emilio Vreca, Manager of PT Product Engineering “Leaks in piping and inefficient compressors further compound energy losses. To address these issues, upgrading to the latest pneumatic conveying solutions can yield substantial improvements.”
The latest pump design—the Fuller-Kinyon® (FK) ‘N’ Pump—provides power savings of up to 15 per cent thanks to an improved seal, while an extended barrel and screw design have improved volumetric efficiency by more than 15 per cent. Similarly, the latest generation Ful-Vane™ Air Compressor has been engineered for increased energy efficiency, with an improved inlet area for capturing larger air flows and compatibility with variable frequency drives.

Optimising energy efficiency in packing and dispatch
Even minor inefficiencies in bagging and palletising can lead to higher maintenance demands, increased material waste, and unnecessary energy use. Reducing these inefficiencies is yet another lever to improve overall plant performance and sustainability.
Upgrading rotary packers enhances weighing accuracy, reduces spout-to-spout variations, and lowers reject rates, improving both product consistency and energy efficiency. Similarly, replacing pneumatic drive systems in palletisers with electric alternatives eliminates compressed air dependency, leading to more precise bag handling and reduced energy demand. These targeted upgrades help streamline operations while minimising environmental impact.
A key development in dust control is the FILLPro™ Dust Reduction Kit for GIROMAT® EVO. “By refining material flow and fluidisation, FILLPro reduces dust emissions at the source, improving bagging efficiency and plant cleanliness,” explains Gabriele Rapizza, Proposal Engineer. “This reduces material loss, prevents blockages, and cuts down on maintenance, helping plants achieve a more stable and energy-efficient packing operation.”

How services contribute to increased energy efficiency
In the past, many viewed the role of the supplier as a “sell-and-move-on” model. Things have certainly changed. As cement producers face challenging markets, heightened competition, and increasingly ambitious decarbonisation targets there is little room to tolerate inefficiencies within the plant. The paradigm has shifted such that the value of expert services is as essential as the initial equipment supplied. Furthermore, as digital solutions progress at speed, a fluid, long-term partnership gives cement plants the best platform to take advantage of the latest tools.
Whether it’s an audit to identify why energy efficiency has decreased from one year to the next, or even an optimisation package preparing your plant for carbon capture solutions – we are believers in the principle that there is always more we can do to improve efficiency. For example, our Online Condition Monitoring Services (OCMS) provide continuous monitoring of critical equipment such as the kiln, mills, cooler and fans, aggregating data and utilising advanced algorithms to identify potential trouble spots. As the OEM and an experienced full solutions provider, we can support these services with expert advice, not only alerting you to a problem but also providing recommendations as to how to remedy it or attending site to support you in person.

Small upgrades, big impact
Energy efficiency is a critical factor, influencing both operational costs and sustainability goals. While large-scale innovations such as carbon capture will play an essential role in long-term decarbonisation (and steal the headlines), incremental mechanical upgrades offer an immediate pathway to lower energy consumption with minimal disruption.
By optimising key process areas — grinding, dosing, combustion, cooling, and material transport — you can achieve measurable energy savings while improving performance and flexibility. These solutions provide a strong return on investment and pave the way for a more sustainable cement industry.

Part 3 of 3. Read Part 1 in the May issue of Indian Cement Review and Par 2 in the June issue of the Indian Cement Review magazine.

(Communication by the management of the company)

Concrete

Nuvoco Vistas Reports Record Q2 EBITDA, Expands Capacity to 35 MTPA

Cement Major Nuvoco Posts Rs 3.71 bn EBITDA in Q2 FY26

Published

on

By

Shares

Nuvoco Vistas Corp. Ltd., one of India’s leading building materials companies, has reported its highest-ever second-quarter consolidated EBITDA of Rs 3.71 billion for Q2 FY26, reflecting an 8% year-on-year revenue growth to Rs 24.58 billion. Cement sales volume stood at 4.3 MMT during the quarter, driven by robust demand and a rising share of premium products, which reached an all-time high of 44%.

The company continued its deleveraging journey, reducing like-to-like net debt by Rs 10.09 billion year-on-year to Rs 34.92 billion. Commenting on the performance, Jayakumar Krishnaswamy, Managing Director, said, “Despite macro headwinds, disciplined execution and focus on premiumisation helped us achieve record performance. We remain confident in our structural growth trajectory.”

Nuvoco’s capacity expansion plans remain on track, with refurbishment of the Vadraj Cement facility progressing towards operationalisation by Q3 FY27. In addition, the company’s 4 MTPA phased expansion in eastern India, expected between December 2025 and March 2027, will raise its total cement capacity to 35 MTPA by FY27.

Reinforcing its sustainability credentials, Nuvoco continues to lead the sector with one of the lowest carbon emission intensities at 453.8 kg CO? per tonne of cementitious material.

Continue Reading

Concrete

Jindal Stainless to Invest $150 Mn in Odisha Metal Recovery Plant

New Jajpur facility to double metal recovery capacity and cut emissions

Published

on

By

Shares

Jindal Stainless Limited has announced an investment of $150 million to build and operate a new wet milling plant in Jajpur, Odisha, aimed at doubling its capacity to recover metal from industrial waste. The project is being developed in partnership with Harsco Environmental under a 15-year agreement.

The facility will enable the recovery of valuable metals from slag and other waste materials, significantly improving resource efficiency and reducing environmental impact. The initiative aligns with Jindal Stainless’s sustainability roadmap, which focuses on circular economy practices and low-carbon operations.

In financial year 2025, the company reduced its carbon footprint by about 14 per cent through key decarbonisation initiatives, including commissioning India’s first green hydrogen plant for stainless steel production and setting up the country’s largest captive solar energy plant within a single industrial campus in Odisha.

Shares of Jindal Stainless rose 1.8 per cent to Rs 789.4 per share following the announcement, extending a 5 per cent gain over the past month.

Continue Reading

Concrete

Vedanta gets CCI Approval for Rs 17,000 MnJaiprakash buyout

Acquisition marks Vedanta’s expansion into cement, real estate, and infra

Published

on

By

Shares

Vedanta Limited has received approval from the Competition Commission of India (CCI) to acquire Jaiprakash Associates Limited (JAL) for approximately Rs 17,000 million under the Insolvency and Bankruptcy Code (IBC) process. The move marks Vedanta’s strategic expansion beyond its core mining and metals portfolio into cement, real estate, and infrastructure sectors.

Once the flagship of the Jaypee Group, JAL has faced severe financial distress with creditors’ claims exceeding Rs 59,000 million. Vedanta emerged as the preferred bidder in a competitive auction, outbidding the Adani Group with an overall offer of Rs 17,000 million, equivalent to Rs 12,505 million in net present value terms. The payment structure involves an upfront settlement of around Rs 3,800 million, followed by annual instalments of Rs 2,500–3,000 million over five years.

The National Asset Reconstruction Company Limited (NARCL), which acquired the group’s stressed loans from a State Bank of India-led consortium, now leads the creditor committee. Lenders are expected to take a haircut of around 71 per cent based on Vedanta’s offer. Despite approvals for other bidders, Vedanta’s proposal stood out as the most viable resolution plan, paving the way for the company’s diversification into new business verticals.

Continue Reading

Trending News