Many plant managers and engineers never get started with a reliability programme because the task seems so challenging. This integrated three-step process includes a System Review, Historical Review and Budget Review. Each step has multiple key components that must be considered when implementing a unit specific strategy, writes Shridhar Nambi, MD, Greenesol Power Systems.

STEP-1: SYSTEM REVIEW

Age of the unit Facilities built in the 1960s and ’70s experience damage related to the obvious number of hours of operation; however, they were designed with heavier wall thickness in both tubing and header components. As a result, these units tend to have longer life expectancies than some of the newer facilities. Facilities that were built in the 1980s pushed the limits with the do more with less approach. Tubing and headers were supplied with thinner walled components, conserving costs on construction, but ultimately reducing the service life of the critical components. Modern facilities are being constructed to adapt to the thermal cycling that has become a part of the energy culture of today and are experiencing earlier than expected failures. Many of these failures are the result of exotic materials that are being used which have not been in service long enough to know the true behavior of the material under the thermal and mechanical stresses of cycling a unit.

Design of the unit

Some boiler units clearly have inherent design flaws. Various design flaws include the placement of the burners in the furnace, how the tubing/headers are supported and/or the use of water guns or soot blowers. Understanding the inherent design flaws of a specific unit will help a company become proactive in their approach to preventative maintenance and ascertain areas to target for remaining useful life determinations.

Materials

Understanding the materials specific to a unit and recognising the inherent concerns of those materials (weld ability, resistance to elevated temperatures and pressure, heat transfer ability) will enable facilities to be more progressive in their pursuit to preventing service related damage.

STEP – 2: FAILURE ANALYSIS

The ability to identify and track the locations of a tube failure and its root cause is essential to comprehensively reducing forced outages. Once the root cause of the failure is properly identified, a long term plan can be implemented to ensure the failures/leaks have been rectified. Proper and current documentation is critical to managing failures and leaks and can be done in real-time with the use of a data management program such as the 4-SYTE System Strategy. Most common causes of failures have been seen to be stress rupture, water-side corrosion, fire-side corrosion, erosion, fatigue, The most likely failures can occur in water wall, economiser and superheater or reheater tube circuits.

Primary failure mechanisms are the processes that degrade the tube and produce a failure. Each failure mechanism may include several circumstances such as poor fuel quality, equipment malfunction or improper operation. Each would be considered a root cause since they have created the conditions for a failure mechanism to exist. Verification of the root cause is a vital activity in a failure investigation and is necessary to assure the correction of a failure problem. Secondary failure mechanisms such as adjacent tube washing or adjacent tube impact can produce a tube failure and are always a concern after an initial failure.

Modifications

At times inherent deficiencies of a unit design will be identified. As a result, the unit may undergo design modifications which can resolve the original design flaw concerns, but ultimately can create other issues such as steam flow restrictions and temperature excursions etc. Additionally, as part of the clean air initiatives currently underway, many units are being modified to burn alternative fuels. Recognising what modifications have transpired in a specific unit can lend perspective into potential side effects which may be occurring as a result of those modifications.

Replacements

As an aging plant begins to experience repeated failures, sections of tubing and other critical components will require replacement. These replaced sections will have fewer hours of operation and therefore will not need to be considered for inspection on the same schedule as original equipment within the unit. This observation is particularly unit specific and is a major basis for why a cookie-cutter approach to inspection/maintenance is ineffective and can lead to squandering of precious budget funding inspecting equipment that has not yet reached a point in its life cycle to require examination.

Operational changes

Most power generation facilities were designed on the assumption that they would be operated in a base-load mode or infrequently cycled. However, in response to local power market conditions and the terms of their power purchase agreements, many plants are now cycling their units more frequently than designers had intended. This results in greater thermal stresses, more pressure cycles, and therefore more cyclic fatigue damage and overall faster wear and degradation to the critical components due to both mechanical and corrosion processes.

As a general comment, cycling service has an adverse effect on the life expectancy of a unit. This is due to the fact that cycling results in fatigue loading (alternating cyclic stresses); whereas base load operation results in creep (sustained stresses). Depending on the severity of the stresses, and the number of cycles, fatigue loading can result in cracking, particularly at restraint locations.

Upsets

When a unit trips and is brought offline suddenly or experiences a water hammer event, an immense amount of thermal and mechanical fatigue can be introduced to the involved components. It is beneficial to understand if a unit has experienced any major upsets during its life cycle in order to determine if evaluating areas that wouldn’t normally come under the microscope is necessary. This is similarly unit specific and would be comparable to the considerations you would evaluate if you were purchasing a used car. Just as the purchaser would investigate any past maintenance troubles or collisions of the vehicle prior to purchasing, plant managers must consider the history of their units prior to determining the inspection prioritisation of their critical components.

Operational training

Often, the operators of units are responding to directives from a senior authority to bring the unit online or offline to meet the load requirements and capacity. Understanding the effects of ramping constraints in both unit commitment and economic dispatch is imperative. Operators can have a tremendous effect on the life expectancy of a unit simply by recognising the effects of proper ramp rate execution. Operators have direct control of the temperature of the unit; therefore proper unit specific training can add years to the life of the unit.

STEP – 3: DETERMINING REMAINING USEFUL LIFE

Determining the remaining useful life of critical components/tubing will allow for proper budgeting for replacements. Additionally, as systems begin to reach the end of their life cycle, more failures will inevitably begin to occur. Understanding when to cut your losses and replace sections will improve reliability. Many factors can affect the life expectancy of key components in a boiler including water chemistry, fuel type and quality, thermal cycles, materials, temperature excursions, inadequate heat transfer and flow rate. Understanding key factors associated with a specific unit that can ultimately contribute to shortening the life expectancy is paramount to predicting remaining useful life of critical components.

Prioritisation: inspection, repairs, replacement

The ability and necessity to develop a plan of action that includes prioritisation for inspection, repairs and/or replacements established from the unit specific design and historical operation will dramatically improve the budgetary process. Allotted funds will be used in an effective manner and outage planners will have the ability to provide back- up documentation required to warrant the necessity for such funding during the company fiscal budget planning process.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Concrete

15th Cement EXPO: A Step Forward in Cement Innovation

Published

on

By

Shares

Mumbai

Following the immense success of the 14th Cement EXPO, held on December 14-15, 2023, at the Manekshaw Centre, New Delhi, the next edition of this premier event is set to take place in March 2025. The 15th Cement EXPO will be hosted at Yashobhoomi, Delhi, on 12th and 13th November 2025.

Meanwhile, the Cement Expo Forum 2025 is scheduled for 5th and 6th March 2025 at Taj Krishna in Hyderabad. This exciting 3-in-1 event, organised by FIRST Construction Council (FCC) and Indian Cement Review (ICR), will bring together industry leaders, innovators, and stakeholders to discuss the future of the cement sector.

Building on the Success of the 14th Cement EXPO

The 14th Cement EXPO was widely praised for its strong participation, attracting over 1,500 senior managers and decision-makers from across the cement industry. The event was inaugurated by Dr. Vibha Dhawan, Director General of TERI, and Ali Emir Adiguzel, Founder and Director of the World Cement Association, alongside Pratap Padode, Founder of FIRST Construction Council (FCC). The two-tiered exhibition space featured cutting-edge products and innovations from top companies within the cement industry’s supply chain.

The event also garnered significant support from key government bodies, including the Ministry of Road Transport and Highways, Government e-Marketplace (GeM), and the Department for Promotion of Industry and Internal Trade (DPIIT), Ministry of Commerce and Industry, Government of India (GoI).

Recognition and Excellence in the Cement Industry

The 7th Indian Cement Review Awards celebrated excellence by presenting awards to 11 companies in various categories, recognising their contributions to growth and innovation within the industry. Notably, Parth Jindal, Managing Director of JSW Cement, was honoured with the prestigious Indian Cement Review – Person of the Year Award 2023. Meanwhile, Vinita Singhania, Vice Chairman and Managing Director of JK Lakshmi Cement Ltd, received the Lifetime Achievement Award for her outstanding leadership and contributions to the sector.

A Vision for Sustainability

With the theme of “Driving Sustainability Through Technology,” the 9th Indian Cement Review Conference hosted thought-provoking discussions and presentations, highlighting the industry’s commitment to adopting innovative, sustainable practices. The conference served as a platform for dialogue on the latest technological advancements aimed at transforming the cement sector, addressing key challenges, and fostering growth.

What to Expect from Cement EXPO 2025

The 15th Cement EXPO, along with the 10th Indian Cement Review Conference and the 8th Indian Cement Review Awards, is set to be even bigger and more impactful than the 2023 edition. With an expanded exhibition space, greater participation, and more in-depth discussions, the 2025 event will continue to drive the industry forward. This 3-in-1 event promises to be a pivotal moment in the ongoing transformation of the cement sector.

As the industry evolves, the 15th Cement EXPO 2025 will serve as a crucial platform for showcasing innovations, discussing emerging trends, and forging new partnerships to shape the future of cement and construction.

For more details:

Cement Expo Forum 2025: https://cementexpo.in/forum

15th Cement Expo 2025: https://cementexpo.in/

FOR CONFERENCE SPONSORSHIPS

Sheetal Talreja

Mob: +91 842 2874 030

Email: sheetal@IndianCementReview.com

FOR EXHIBITION/SPONSORSHIPS

Sujoy Gomes

Mob: +91 865 7795 881

Email: Sujoy.g@ASAPPinfoGlobal.com

FOR SPONSORSHIPS

Ratan Rajbhar

Mob: +91 842 2874 021

Email: ratan.r@ASAPPinfoGlobal.com

Continue Reading

Concrete

Construction sector growth slows to 8-10% for FY2025: ICRA

Published

on

By

Shares

The revenue growth for construction companies in FY2025 is projected at 8-10 per cent, down from the earlier estimate of 12-15 per cent, according to ICRA. This marks the slowest growth in three years, driven by factors such as the Model Code of Conduct in Q1, prolonged monsoons, and milestone-based billing in Q2, particularly affecting road-focused players.
ICRA’s analysis of 19 companies with a combined turnover of Rs.1.28 trillion in FY2024 shows modest revenue growth of 1.5 per cent YoY in H1 FY2025. While execution is expected to improve in H2, FY2025 growth remains below the historical CAGR of ~15 per cent (FY2018-FY2024).
Order inflows in urban transport, water and sewage projects are healthy, but road-focused entities face challenges due to muted inflows and high competition. Operating margins are projected to remain range-bound at 10.5-11 per cent, with debt levels rising to manage working capital needs, though debt coverage metrics remain stable.

Continue Reading

Concrete

SANY India expands Pune factory to boost production capacity

Published

on

By

Shares

SANY India inaugurated a cutting-edge factory expansion at its 90-acre Pune facility, elevating its production capacity to over 14,000 units annually, alongside a robust fabrication capacity of 100,000 metric tonnes.

The advanced facility reinforces SANY’s commitment to ‘Make in India’ by enhancing localised manufacturing and supporting global exports. Chairman Xiang Wenbo highlighted the strategic importance of India as a global hub, while Vice Chairman Deepak Garg emphasised the expansion’s role in driving innovation and infrastructure development. This investment enhances efficiency, reduces timelines, and strengthens SANY’s leadership in the construction equipment sector.

 

Continue Reading

Trending News

This will close in 5 seconds

SUBSCRIBE TO THE NEWSLETTER

 

Don't miss out on valuable insights and opportunities to connect with like minded professionals.

 


    This will close in 0 seconds