Cold weather is defined as a period when the average daily temperature falls below 4?C for more than three successive days. These conditions warrant special precautions when placing, finishing, curing and protecting concrete.

Concrete production always faces a problem during cold weather. There are two main problems associated with cold weather. The general rule is that the concrete has to gain strength till about 500 psi (35 kg per cm2).

Concrete can freeze before it gains strength which breaks up the matrix;
Concrete sets more slowly when it is cold – very slow below 6? C; below 4? C, the hydration reaction basically stops and the concrete doesn’t gain strength.
But these are concrete temperatures, not air temperatures. So when it’s cold, the concrete has to be protected until it can handle the cold on its own. The general rule is that the concrete has to gain strength till about 500 psi (35 kg per cm2). Almost the same time that the concrete achieves 500 psi compressive strength, hydration of the cement consumes enough of the water in the original mix so that even if it does freeze, there’s not enough water left in the pores to damage the concrete. With most concrete, even at 6?C, this happens during the second day.

To help it reach that 500 psi strength, the mix can then be changed to get it to set more quickly or protect the concrete from the cold – or more likely do both.

Changes to Concrete Mix during Cold Weather
Many of the problems with cold weather can be overcome by the ready mix producer. Here are a few things to keep in mind:
Hot water: A ready mixed concrete producer will usually have, and use, hot water in the concrete when the weather turns cold. Most producers will try to have the concrete be at least 180C when it leaves the plant, which is generally good enough depending on air temperature and thickness of the concrete element. The slump has to be specified at less than 100 mm and air-entrained concrete should be used to reduce bleeding.

Accelerators: Since colder weather leads to colder concrete, the set time can be delayed. Accelerators added to the concrete can keep it on schedule. Addition of 2 per cent (by weight of cement) of calcium chloride is the traditional way to accelerate the hydration reaction – it is very effective and reasonably cheap. But – a big but -that much chloride can lead to corrosion of any steel embedded in the concrete (like rebar) and can lead to a mottled surface appearance with coloured concrete.

Non-chloride accelerators are also widely available and are very effective. They won’t discolour the concrete, but they are a bit expensive. Accelerators are not anti-freeze agents – they simply increase the rate of the hydration reaction.

Fly ash: Producers should typically stay away from using fly ash or slag cement in cold weather, since those materials set more slowly and generate less internal heat; slag can cause the same effect.

To make the reaction a bit hotter, the ready mix producer can add some extra cement (typically 60 kg per cubic metre) or can use Type III (high-early strength) cement, which hydrates more rapidly.

Producers have to be careful with water reducers in cold weather, since they can slow the set time. Besides, cooler concrete seldom needs water reduction since the cooler temperatures prevent slump loss. For admixtures added at the job site, they shouldn’t be used if they have frozen. The chemicals may have separated.

Precautions before Placing Concrete in the Cold
When cold weather comes on unexpectedly, the following tips will help:
Frozen ground: Concrete should be never placed on frozen ground or onto ice or snow. There are a couple of problems with this. First, frozen ground will settle when it thaws, cracking the concrete. Second, when the ground is cold, the concrete in contact with it will be cold and will set more slowly. Crusting might also occur, with the top part of the concrete set and the bottom still soft. If the ground is frozen, it can be thawed using hydronic heat pipes and blankets (such as those from ground heaters), or electric blankets.

Anything that will come in contact with the concrete should be warmed up, including forms and any embedment, to at least 00C. If it’s not too cold and everything is covered with tarps the day before the pour, it will stay dry and warm enough.

Continue Reading
Click to comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Concrete

Star Cement launches ‘Star Smart Building Solutions’

Published

on

By

Shares

Star Cement has launched ‘Star Smart Building Solutions,’ a new initiative aimed at promoting sustainable construction practices, as per a recent news report. This venture introduces a range of eco-friendly products, including tile adhesives, tile cleaners and grouts, designed to enhance durability and reduce environmental impact. The company plans to expand this portfolio with additional value-added products in the near future. By focusing on sustainable materials and innovative building solutions, Star Cement aims to contribute to environmentally responsible construction and meet the evolving needs of modern infrastructure development.

Image source:https://www.starcement.co.in/

Continue Reading

Concrete

Nuvoco Vistas reports record quarterly EBITDA

Published

on

By

Shares

Nuvoco Vistas reported its highest-ever quarterly consolidated EBITDA of Rs.556 crore in Q4 FY25, with annual EBITDA at Rs.1,391 crore. Cement sales reached 19.4 MMT in FY25, with Q4 contributing 5.7 MMT. Revenue rose 4 per cent YoY to Rs.3,042 crore in Q4. Net debt reduced by Rs.390 crore to Rs.3,640 crore. The company received NCLT approval for acquiring Vadraj Cement, targeting 31 MMTPA capacity by FY27. Key marketing initiatives, expanding RMX and MBM businesses, and a focus on sustainability (457 kg CO2/tonne) drove performance. Nuvoco remains focused on premiumisation, operational efficiency, and market expansion.

Image source:nuvoco.com

Continue Reading

Concrete

UltraTech Cement increases capacity by 1.4Mt/yr

Published

on

By

Shares

UltraTech Cement has expanded its production capacity by 1.4 million tonnes per annum (Mt/yr) through a combination of debottlenecking efforts and operational efficiency upgrades across several of its plants. The enhancements include an addition of 0.6Mt/yr in grinding capacity at the Nagpur facility in Maharashtra and a combined 0.8Mt/yr at the Panipat and Jhajjar units in Haryana. With these upgrades, the company’s total domestic grey cement capacity has risen to 184.8Mt/yr, while its global capacity now stands at 190.2Mt/yr.

Continue Reading

Trending News

SUBSCRIBE TO THE NEWSLETTER

 

Don't miss out on valuable insights and opportunities to connect with like minded professionals.

 


    This will close in 0 seconds

    This will close in 0 seconds