Thyssenkrupp Industrial Solutions has received a contract from HeidelbergCement to supply a new clinker production line, to be built at the Schelklingen plant. The 4500 tpd facility will replace an existing older production line. Start of production is planned for spring 2018. Thyssenkrupp will supply components, including a 5-stage, single-strand DOPOL pre-heater, a POLRO rotary kiln with a POLGUIDE drive system, and a POLYTRACK clinker cooler with roll crusher.