Christian Pfeiffer confirmed it has received the order to erect a turnkey cement grinding plant for Caha Mata Sarawak (CMS), in Kuching, Malaysia. The contract includes silos and packing facility. The EUR36m deal comprises of providing engineering, fabrication, and supply of the entire equipment including electrical and control equipment, installation and commissioning of the grinding plant as well as the complete construction work and layout of roads.The grinding plant is designed for a capacity of 150 tph (1 mtpa) for OPC with 3500 cm-?/g. Delivery includes a two-chamber ball mill with slide shoe bearing (4.8 m x 15 m), equipped with a wear-resistant shell liner made of progressive lifters for the first grinding chamber.