Heavy engineering and manufacturing firm Promac Engineering Industries has bagged three export orders valued at more than $220 million. Chairman and Managing Director of the city-based Promac, J Surendra Reddy said these include setting up two cement plants – one in Fujairah, the UAE and another in Tanzania. The third order is to build Balance of Plant (BOP) for a 125 MW thermal power plant in Senegal, he told reporters. He said the one million ton per annum capacity dual plant being set up for J K Cements in Fujairah on EPC (Engineering, Procurement and Construction) contract basis is capable of producing both white and grey cement in the same kiln.